Skip to content
Normalised Alpha
Research Frameworks Tools Adi Index Advisory About
ESSAY ·Tech Spotlights

Ayar Labs and Lightmatter · the CPO scale-up window

Paired underwriting of the two venture-stage silicon-photonics pure plays through the Rubin Ultra 2027 CPO scale-up window. CPO can win the technology transition and Ayar and Lightmatter can still lose the economics.

11 September 2026 · 46 min read
ESSAY ·Tech Spotlights

Wolfspeed's Second Act: rising from Chapter 11 on the medium-voltage side of the AI data centre

Wolfspeed emerged from a 91-day prepack in Sep 2025. This piece works bottom-up through where silicon carbide climbs in the AI data centre stack, sizes Wolfspeed's exposure by equipment layer, and delivers three scenarios for the reorganised common.

10 September 2026 · 48 min read
ESSAY ·Tech Spotlights

Vicor direct-to-pin power for AI accelerators

Vicor (NASDAQ: VICR) has been selling factorized-power architecture for forty years. The last three years brought VPD and direct-to-pin modules into the mainstream as AI accelerator power density broke the incumbent multi-stage delivery model. Sub-$4B market cap, ~$400M revenue, meaningfully hi

8 September 2026 · 33 min read
ESSAY ·AI Power Chain

Behind-the-meter gas microgrids: a firm-power route around the interconnection queue

The behind-the-meter gas microgrid is a firm-power route around the 4-7 year interconnection queue for AI datacenters. Enchanted Rock is the canonical operator; ~366 MW at Meta El Paso and 60 MW Phase 1 at Microsoft San Jose are the flagship deployments.

7 September 2026 · 31 min read
ESSAY

Flexibility as capacity: How grid and AI compute interact, and what Emerald AI needs to justify $1.05B

How grid and AI compute interact through the flexibility right, with an opinionated view on Emerald AI's Series A valuation.

5 September 2026 · 58 min read
ESSAY ·AI Infrastructure

Underwriting Ferric after the Empower exit

The only independent integrated voltage regulator play left after ADI's $1.5B Empower acquisition. Fe1766, thin-film magnetic inductors on CMOS, TSMC integration, Marvell design win. Six gates, three vetoes, three scenarios.

3 September 2026 · 28 min read
ESSAY ·AI Infrastructure

What Ferric is worth after ADI paid $1.5 billion for Empower

ADI closed the Empower acquisition for $1.5B on July 7, 2026. Ferric is the standalone integrated voltage regulator play left. Canonical map of the last stage of AI accelerator power delivery: physics, architecture, players, scenarios, and falsifiers.

3 September 2026 · 40 min read
ESSAY

The AI Semiconductor Waterfall: $34M of Silicon Per MW of Compute

Semiconductor intensity per MW of AI compute, decomposed across compute, storage, networking, and power layers. Reference case: 1 MW Blackwell/GB200 NVL72 ≈ $34M of semiconductor-bearing equipment value. Vendor exposure map by basket.

3 September 2026 · 50 min read
ESSAY ·Grid-to-Chip

Copper hits the wall in AI racks: the migration to optical, CPO and silicon photonics

Copper loses metres each generation as per-link bandwidth scales from 400G to 1.6T. Silicon photonics fabs (GF Fotonix, TSMC), CPO specialists (Ayar Labs, Lightmatter, Ranovus, Celestial AI) and pluggable optical OEMs capture the migrating value.

2 September 2026 · 39 min read
ESSAY ·Grid-to-Chip

Battery role migration: from backup to grid-forming

The AI-DC battery is migrating through six economic roles (backup, ride-through, power smoothing, peak management, grid services, grid-forming). Each role carries a different vendor cohort, revenue mechanism and regulatory gate. Screen for role-stage exposure before chemistry.

1 September 2026 · 32 min read
ESSAY ·Financing

The Capital Stack of AI Infrastructure

Bottom-up build of the five-layer, five-source capital stack financing AI infrastructure 2026-28. Three headline measurements ($0.65T financing · $0.95T formation+procurement · $0.16T refi) plus the framework for a quarterly Ledger.

1 September 2026 · 79 min read
ESSAY

Wide-Bandgap Semis in 2026: NVTS, Wolfspeed, Innoscience, and the Contest for Sockets Above 400V

Wide-bandgap power semiconductors compete across three end markets with different physics: AI power supply, EV traction inverter, and industrial. Primary spotlight on Navitas (NVTS), Wolfspeed (post-Chapter-11), Innoscience (Nvidia Rubin Ultra 800V design win), and EPC. Extended field: Infineon, ST

1 September 2026 · 64 min read
← Newer Page 2 of 9 Older →
Frameworks
  • The AI Power Chain
  • The Investment Layer
  • Due Diligence Framework
  • Grid-to-Chip
Series
  • The DC-DC Transition
  • Thermal Management
  • The Regulatory Layer
  • Financing the AI Buildout
  • Tech Spotlights
  • Case Studies
  • Deal Tear-Down + Watch
  • What Changed (monthly recap)
Reference & Tools
  • Knowledge Base
  • Adi's Theses
  • Glossary
  • Vendor Screen
  • Question Banks
  • DD Evidence Matrix
  • Investment Scorecard
  • Investment Workbench
Engage
  • Advisory
  • About
  • adi@adikumar.co
  • LinkedIn
  • X (@NormalisedAlpha)
© 2026 Adi Kumar. All rights reserved. All content on this site — including essays, analysis, frameworks, charts, models, code, visualisations, and interactive tools — is the copyrighted work of Adi Kumar. No part may be reproduced, distributed, transmitted, republished, syndicated, adapted, translated, stored in a retrieval system, quoted at length, incorporated into commercial products or reports, or used to train machine-learning or artificial-intelligence models — in whole or in part, in any form or by any means — without the prior express written permission of the author. Brief quotations of up to 100 words with clear attribution and a direct link to the source page are permitted under fair use. All other uses require written consent: adi@adikumar.co.
Written by Adi Kumar · Privacy