Physical infrastructure · standalone essay

The modular data centre: how factory-built power and IT halls compressed construction time

Modular data centres split into two structurally different categories: grey-space power skids and white-space IT-hall pods that compose a campus. Grey-space modular is the power skid: MV/LV transformer, switchgear, UPS, batteries, controls, factory-assembled into one tested unit that delivers reliable, predictable power to racks. Most merchant modular volume today is grey space. White-space modular is the IT-hall pod: racks, containment, busway, cabling and (where AI density warrants it) in-pod cooling, factory-fitted into one unit that delivers a rack-ready hall. Cooling appears in the pod because the pod contains the racks. This essay walks the categories separately, then covers why AI infrastructure is pushing both up, how the incumbent transactions map onto each, and where the value is captured.

Reader takeaways
The categories
Grey-space modular (power skids) and white-space modular (IT-hall pods) compose a campus; substitution between them is limited. DD OBSERVATIONIn the vendor field examined here, grey space appears to account for most merchant modular volume. Cooling appears in white-space pods only because those pods contain the racks.
Why modular exists
AI campuses need MW-volume power delivery at speed, with a reliability range inherited from factory qualification. Assembling dozens of on-site power modules sequentially against a stick-built shell is slow and error-prone. Factory-assembled power skids move the work upstream and deliver a predictable reliability range.
What AI adds
Higher rack density (100+ kW) makes factory-integrated cooling valuable in white-space pods that contain the racks. Cooling appears as an adjacency in the white-space category; the origin of the modular category comes from the power side. The power side remains the dominant volume.
Incumbent moves
Eaton + NordicEPOD grey-space stake (2024). Eaton + Fibrebond ~$1.4B, closed April 2025. Schneider + Compass EcoStruxure Pod launched September 2025 (white-space). Vertiv + PurgeRite ~$1B cooling services, closed December 2025. Ecolab + CoolIT ~$4.75B white-space thermal, closed July 2026.
Timeline reality
Modular compresses construction time. It does not compress energisation or utility interconnection. In constrained markets, ground-break to revenue-ready can still run 24-48 months or longer even when modular hardware is fabricated in months.
Value capture
Modularisation shifts value from individual component supply toward whoever owns the interfaces (LV busway, MV feed, cooling loop, protection coordination), the qualification programme, and the repeatable reference design. The recent incumbent transactions are consistent with that shift.
Evidence classes used in this essay. To keep facts, published estimates, and analytical inference visibly separate, four badges appear where a number, date, or claim is stated: PUBLIC FACT corporate disclosure, filing, or first-party press release (linked in annex). PUBLISHED ESTIMATE third-party research or trade-press estimate; treat as directional. AUTHOR SCENARIO author-synthesised range or scenario; not a market forecast. DD OBSERVATION anonymised observation from due-diligence engagements 2024-2026.

01The categories of modular data centre

Modular data centre coverage frequently collapses two structurally different product categories into one taxonomy. Doing so misreads the vendor field, the incumbent M&A moves, and the point at which cooling integration appears. The clean split is grey space versus white space. Figures 1a and 1b below show each arrangement directly. DD OBSERVATIONIn the vendor field examined here, grey space appears to account for most merchant modular volume. and deep-dive each category; maps the incumbent transactions onto the split.

Containerised all-in-one deployments (Huawei FusionDC1000A, edge-focused OEMs) bundle both categories into one enclosure at smaller scale. They are structurally closer to white-space modular because they contain the racks, at edge scale (hyperscale operations stay on different unit sizes).

Figure 1a
Category A. Grey-space modular. How the power skid is arranged
TOP-DOWN PLAN VIEW · TYPICAL ENCLOSURE ~12 m x 3 m Approximate proportions only. Component sizes are illustrative to show sequence and adjacency. ~12 m (39 ft) length 1 MV RMU + transformer Steps utility feed 11-33 kV to 415/480 V Room HVAC above 2 LV switchgear + panel boards Feeder breakers, metering, arc-flash protection relays 3 UPS module + battery cabinet Double-conversion UPS, Li-ion or VRLA batteries, static bypass Some architectures integrate the two; others keep them separate 4 Controls + monitoring BMS integration, SCADA gateway, protection relays, metering 5 Skid HVAC Electrical room cooling (not IT-hall cooling) 6 Fire suppression Clean-agent panel (FM-200 or Novec) 7 Output section LV busway tap-off Metering, alarm points to facility DCIM MV IN 11-33 kV utility feed LV OUT 415/480 V busway to pods Controls IN SCADA, life safety DCIM/BMS monitoring Life safety alarms POWER FLOW LEFT TO RIGHT Utility MV feed enters at (1), passes through step-down transformer, then LV switchgear at (2). The main current path runs to the UPS at (3), where the battery bank supports ride-through during utility disturbances. Controls at (4) coordinate BMS integration, protection, and metering. Skid HVAC (5) cools the electrical room only. Fire suppression (6) protects the compartments. Output section (7) taps LV busway to the pods. WHAT THIS UNIT DOES NOT CONTAIN No IT racks, no rack-level cooling, no cold plates, no leak detection for IT water loops. Those belong to the white-space pod (Figure 1b, Figure 3). This unit is a factory-tested power substation. The racks it powers are somewhere else on the campus.
The grey-space power skid is a factory-tested power module in a container-scale enclosure, packaging MV/LV transformation, LV switchgear, UPS, batteries, and controls into a single tested unit. Utility MV feed enters on the left, steps down through the transformer, then flows through LV switchgear, UPS with battery cabinet, and output section to the LV busway that feeds white-space pods elsewhere on the campus. Skid HVAC cools the electrical room only; fire suppression protects the compartments. This unit does not house IT racks and does not hold IT cooling.
Figure 1b
Category B. White-space modular. How the IT-hall pod is arranged
TOP-DOWN PLAN VIEW · TYPICAL POD ~18 m x 6 m Approximate proportions only. Rack count and dimensions vary by vendor and configuration. ~18 m (59 ft) length Overhead busway with per-rack drop-outs A1 A2 A3 A4 A5 A6 A7 A8 A9 ... HOT AISLE CONTAINMENT Ceiling + end doors seal the aisle; captured hot air returns to CDU-side exchange B1 B2 B3 B4 B5 B6 B7 B8 B9 ... Structured cabling ladder + fibre trunks Under-floor manifold: water supply (solid), water return (dashed), leak-detection loop CDU Coolant Distribution Unit 100 kW to 1.2 MW+ Cold-plate quick-disconnects Integrated leak detection + rapid isolation valves LV BUSWAY IN 415/480 V from power skid WATER SUPPLY IN Facility loop, cold side WATER RETURN OUT Facility loop, warm side FIBRE + CONTROLS Network trunk, BMS LEAK ALARM Isolation signal to facility POWER + COOLING FLOW LV busway enters on the left, feeds the overhead busway across the top, drops out to each rack via per-rack PDUs. Cold water enters the pod at the CDU on the right, is delivered through the secondary loop and cold-plate quick-disconnects to the GPU cold plates, then returned warm to the facility loop. Hot air from the racks is captured in the containment aisle and returned to the CDU-side exchange or facility air handlers. WHAT THIS UNIT CONTAINS THAT THE POWER SKID DOES NOT Racks, hot-aisle containment, an in-pod CDU sized to the pod IT load, secondary water loop with cold-plate quick-disconnects, integrated leak detection, structured cabling for network. Cooling appears in this category because the pod contains the racks.
A representative white-space pod: rack rows with hot-aisle containment, overhead busway with per-rack drop-outs, structured cabling, and, where liquid cooling is deployed, either an in-pod CDU (shown here) or a manifold connecting to a central perimeter CDU ( covers the architectural distinction). Interfaces to the outside: LV busway, water supply and return, fibre and controls, leak alarm.

The rest of this essay covers each category on its own terms, then reads the incumbent transactions and the value capture through that lens.

A side-by-side look at the categories

The distinction between grey-space skids and white-space pre-fab lies in what they house, where they are located, and who operates them. Grey-space skids are utility-plant assemblies engineered to keep the facility alive. White-space pre-fab is the compute enclosure engineered to house and cool the revenue-generating IT gear.

DimensionGrey-space skids (facility / MEP)White-space pre-fab (IT / compute enclosure)
Physical location Electrical rooms, mechanical galleries, rooftops, outdoor perimeter yards Inside the conditioned data hall (IT raised floor or slab)
Primary payloads MV/LV transformers, switchgear, UPS + battery cabinets, plate heat exchangers, generator interfaces, pumps IT server racks, hot/cold-aisle containment, overhead busway tap-offs, fibre conveyance, in-row CDUs, secondary fluid manifolds
Mechanical form factor Heavy structural steel channel bases, rigging eyes, thick-gauge vibration-isolated skid frames Aluminium/steel modular frameworks, aisle ceiling panels, drop-down containment doors, flat-pack or rolling modular rows
Weight profile Concentrated heavy loads (large transformers, UPS, switchgear) Distributed floor loads at rack footprint; higher per-rack as liquid-cooled AI density rises
Delivered medium MV utility power plus chilled water, condenser water and fuel-line connections Regulated LV AC busway (or, at higher densities, bipolar ±400 VDC or 0-800 VDC configurations per OCP LVDC and Mt Diablo topologies), IT network fibre, secondary technical water loops
Testing and QA at factory High-voltage hipot testing, breaker injection, hydrostatic testing of heavy piping, arc-flash compliance Helium leak testing, ultra-pure water/glycol flushing, particulate cleanliness, optical insertion-loss testing, containment integrity
Refresh horizon Tied to the facility lifecycle. Rarely swapped once commissioned Tied to IT refresh cycles, which run faster than facility cycles under AI density transitions
Primary stakeholder Facilities engineering, MEP contractors, civil plant directors IT operations, white-space architects, compute/hyperscale tenants
What it de-risks The capital project schedule and facility commissioning IT deployment velocity and operational flexibility across density transitions

The categories are compositional. and deep-dive each; and map the transactions and capex mix onto the split.

Where the categories interlock. The boundary between grey and white space is the construction handover. Grey-space skids terminate at large busduct flanges and mechanical flanged pipe headers that feed into the data hall. Inside the hall, the white-space pre-fab takes over at the busway riser and secondary loop manifold, distributing power overhead down to individual rack PDUs and coolant through in-pod CDUs to cold plates on the compute. The white-space pod captures heat at the chip and chassis level and transfers it into the facility cooling system, which may comprise a primary water loop, heat exchangers, chillers, dry coolers, or cooling towers depending on the campus architecture. The grey-to-white boundary is therefore an electrical, mechanical, and controls interface; a single shared thermal loop would be a different architecture. Every interface at the boundary is a candidate for the interface-ownership question Figure 12b traces.

The lifecycle mismatch is why the categories cannot be structurally merged. Grey-space skids are tied to a facility-scale lifecycle (typically 15-25 years for the transformer, switchgear, and UPS core). White-space pods refresh with the IT cycle, which under AI density transitions can run every 3-5 years. Merging both into one physical assembly forces the shorter cycle onto the longer one (stranding capex when compute refreshes) or the longer onto the shorter (delaying compute refresh behind facility upgrade). Neither is acceptable at hyperscale, which is why the split persists.

02Grey-space modular: the power skid

The pre-integrated power skid is a category where merchant modular volume appears to concentrate. The category exists because assembling the full electrical plant on-site (MV/LV transformation, LV switchgear, UPS, batteries, controls) across dozens of instances on a hyperscale campus is slow, labour-constrained, and error-prone. Doing it once at the factory, then repeating that factory-tested unit dozens of times, changes the deployment model.

Figure 2
Inside a pre-integrated power skid
CUTAWAY: PRE-INTEGRATED POWER SKID Typical enclosure dimensions: approximately 12 m long, 3 m wide, 3 m tall. Factory-assembled, factory-tested, shipped as one unit. 1 MV/LV transformer Steps 11-33 kV feed down to 415 or 480 V. Sized to skid rating, typically 2.0-2.5 MW. 2 LV switchgear and panel boards Feeder breakers, metering, arc-flash protection relays, busway drop-outs. 3 UPS + battery cabinet Double-conversion UPS module, integrated Li-ion or VRLA battery cabinet, static bypass. 4 Controls + monitoring BMS integration, protection relays, SCADA gateway, metering. 5 Skid HVAC Electrical-room cooling 6 Fire suppression Clean-agent panel MV feed IN 11-33 kV utility feed Controls IN SCADA, BMS LV busway OUT to white-space pods Monitoring OUT SCADA to DCIM Life safety OUT to facility panel INTERFACES THIS UNIT EXPOSES Every pre-integrated power skid exposes the same interface set to the outside world, regardless of vendor. Which is why one skid can substitute for another at the interface layer even when internal engineering differs. Left side (utility side): MV feed in (typically 11-33 kV depending on jurisdiction), controls channel to SCADA / BMS. Right side (facility side): LV busway out to white-space pods (typically 415 V or 480 V), monitoring channel to DCIM, life-safety alarm channel. Layout indicative. Actual compartmentalisation varies by vendor (Eaton Fibrebond, NordicEPOD, Delta modular, Siemens Sivacon, ABB modular, Schneider Prisma). Interface set is common across the product class. Vendor differentiation focuses on internal component selection and factory qualification programme. Reading this figure: the interfaces on the left and right sides are what compose the campus. The internal compartments are what the vendor productised.
The power skid contains an MV/LV transformer, LV switchgear and panel boards, a UPS with integrated battery cabinet, controls and monitoring, dedicated HVAC for the electrical room, and fire suppression. Everything is factory-assembled and factory-tested. The skid exposes a small, well-defined interface set to the outside world.

Contents. A typical Fibrebond or NordicEPOD power skid combines an MV/LV transformer sized to the skid rating, low-voltage switchgear and panel boards with breakers and metering, a UPS system with associated battery cabinets (lithium-ion increasingly, VRLA legacy; some architectures integrate the two, others keep the cabinets separate), a controls and monitoring panel running the BMS integration and protection relays, dedicated HVAC for the electrical room itself, and fire suppression. All of this is assembled and factory-tested before the skid leaves the plant.

Interfaces. The skid exposes an MV feed in (typically 11-33 kV depending on jurisdiction) and an LV busway out (typically 415 V or 480 V) to white-space pods or IT halls elsewhere on the campus. Controls, monitoring, and life-safety supervision channels connect back to the facility BMS and DCIM. The interface set is common across the product class regardless of vendor.

Category leaders. Eaton Fibrebond (Minden, Louisiana; acquired by Eaton for $1.4B, closed April 2025) is a major US manufacturing footprint for hyperscale-scale grey-space deployment. Eaton NordicEPOD (Oslo, Norway; 49% Eaton stake in NordicEPOD AS with CTS Nordics) covers the European hyperscale market with standard 1.7 MW and 2.0 MW configurations and custom designs up to 3.1 MW per Eaton's current product material. Delta InfraSuite grey-space skids, Flex modular power pods, AVK PowerPods, Layer 1 Technologies PowerPods, WB E-Pod, and ePod Solutions each hold portfolios of merchant grey-space modular product. Vertiv's SmartMod PowerMod variants also cover the grey-space case.

Why AI accelerates this category. A hyperscale AI campus can require tens to hundreds of megawatts of electrical capacity, with the largest campuses extending beyond 500 MW. Delivering that MW capacity reliably at the rack requires MV/LV distribution and backup power infrastructure repeated across the campus. Factory-assembled skids convert that from a bespoke construction problem to a repeatable procurement decision. That is one reason modular manufacturing and integration capability has become an acquisition target for incumbent infrastructure vendors.

Transient load response is a first-class engineering justification. AI training workloads create instantaneous step-loads that drive di/dt transients and resonant frequencies through the LV power path. Factory integration delivers the advantage; site-built systems can also be engineered for these transients, with more field work; site-built systems can be, and often are. It is that the vendor can qualify the transformer, conversion equipment, protection, and battery ride-through against a known and repeatable impedance path before shipment, reducing one class of site-integration uncertainty. This is one of the more consequential engineering justifications for pre-fab power skids and rarely appears in vendor marketing.

Battery chemistry and code compliance. Modern skids increasingly ship with lithium iron phosphate (LFP) cells; NMC lithium-ion is the legacy chemistry. LFP generally has favourable thermal-stability characteristics relative to NMC, which can simplify aspects of fire-safety design in containerised skids; the actual NFPA 855 compliance scope remains system- and jurisdiction-specific, depending on cell format, container configuration, detection, ventilation, and applicable code requirements. LFP is heavier per kWh than NMC, so the trade-off shows up in skid weight and transport-corridor headroom.

03White-space modular: the IT-hall pod

The white-space pod category emerged when rack power draws crossed the density regime where cooling loops and rack rows have to be qualified together at the factory; on-site qualification stays slower and less repeatable. covers the density transition and its adjacency to the modular category more broadly.

Figure 3
Inside a prefabricated white-space pod
CUTAWAY: PREFABRICATED WHITE-SPACE POD Typical dimensions: approximately 18 m long, 6 m wide, 3.5 m tall. Contains rack rows, in-pod cooling, busway, cabling, and integrated leak detection. Rack row A (12 racks, 100-140 kW each) A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 HOT AISLE CONTAINMENT Return air captured and directed to the CDU-side cooling exchange. Ceiling and end-doors seal the aisle. CDU + secondary loop Sized for pod IT load 100 kW to 1.2 MW+ Cold-plate side quick-disconnects Integrated leak detection + rapid isolation valves 1 2 3 4 5 Water supply / return manifold beneath the raised floor LV busway IN from power skid Water supply IN to CDU primary side Water return OUT from CDU primary side Fibre + controls network trunk in POD CONTENTS AT A GLANCE 1. Overhead busway + rack PDUs Drop-out per rack from an overhead busway; per-rack PDUs distribute to servers. 2. In-pod CDU + secondary loop Coolant Distribution Unit sized to the pod load; secondary loop pre-plumbed at factory. 3. Leak detection + controls Drip pans, conductivity monitors, rapid-isolation valves. Integrated at factory. 4. Hot aisle containment Ceiling and end-doors seal the aisle; captured air returns to the CDU-side exchange. 5. Rack rows A + B, 10-14 racks per row Racks pre-cabled where the vendor scope includes cabling; otherwise racks arrive dressed on-site. Reading this figure: the interfaces on the left side are what compose the pod into the wider campus. Everything inside is factory-integrated.
The white-space pod contains two rack rows with hot-aisle containment, an in-pod CDU sized for the IT load with a secondary water loop pre-plumbed to cold-plate quick-disconnects, overhead busway with per-rack drop-outs, integrated leak-detection, and structured cabling. Interfaces exposed to the outside: LV busway, water supply, water return, fibre and controls trunk.

Contents. A Schneider EcoStruxure Pod or a Vertiv SmartMod Max opens to two rows of IT racks in a hot-aisle-containment configuration, an in-pod CDU sized to the pod's IT load with a secondary water loop pre-plumbed and quick-disconnect connectors on the cold-plate side, an overhead busway with per-rack drop-outs, structured cabling infrastructure including fibre trunks and copper ladders, and an integrated leak-detection system with drip pans, conductivity monitors, and rapid-isolation controls.

Interfaces. The pod exposes an LV busway feed in, water supply and return lines to the facility water loop, fibre and controls trunks, and a leak-detection alarm channel. The cooling interfaces (pressure ratings, pipe diameters, quick-disconnect specifications) are typically proprietary to the vendor, which is why multi-vendor pod deployments need a documented cooling-interface schedule at the operator specification stage.

Category leaders. PUBLIC FACTSchneider EcoStruxure Pod, jointly launched with Compass Datacenters on September 9, 2025, is described in Schneider product material at up to 42 racks per pod at 132 kW per rack; actual pod power depends on configured rack count and rack-level density. The pod supports hybrid liquid-air cooling architectures and includes a technical water loop pre-plumbed for direct-to-chip integration. PUBLIC FACTVertiv SmartMod Max supports up to 200 kW; Max DX supports up to 26 racks and Max CW up to 24 racks. Huawei FusionModule2000 and FusionDC1000B / 1000C integrate rack rows, in-row cooling, intelligent power distribution, and integrated leak detection. Delta InfraSuite Prefabricated AI MDC (launched at COMPUTEX 2026) integrates 800 VDC in-row power with GoCool 260 kW LTA and 3 MW LTL cooling. Rittal offers white-space kits with modular CDUs scaling from tens of kW to over 1 MW per unit.

Why cooling appears here and not elsewhere. Cooling integration is a defining feature of white-space pods because the pod contains the racks and their heat load. In grey-space skids, the only cooling is skid HVAC for the electrical room itself. Cross-category matrix compatibility is worth reading directly.

Engineering shifts that drove the white-space pod category.

  • Factory-integrated secondary fluid networks. High-density pods increasingly leave the factory pre-plumbed with stainless steel or specialty-thermoplastic headers, flow-balancing valves, and blind-mate dripless quick-disconnects (QDs) ready to hook up to external CDU distribution loops. On-site plumbing scope collapses.
  • Overhead infrastructure consolidation. Modern pods route both overhead tap-off busway (415/480 V AC now, 800 VDC increasingly) and fibre trays through unified top-of-rack structural trusses, eliminating field-erected trapeze rigging and reducing the trade coordination load.
  • Adaptive liquid-ready containment. Pod vendors are standardising on containment blocks that deploy with air cooling today and accept drop-in in-row CDUs and rear-door heat exchangers without structural rework as density rises. This decouples the pod purchase decision from the cooling architecture commitment.
  • Seismic and floor-loading ratings. AI clusters (multi-rack NVLink and Infiniband domains) raise floor-loading and lateral-force ratings materially. Modern pod floors and castor-guide track systems specify for higher dynamic rolling loads per rack footprint than pre-AI containment products supported.
Figure 4
Cooling architecture and white-space pod compatibility
DTC (direct-to-chip liquid) RDHx (rear-door heat exchanger) Immersion Containerised Partial. Small CDU per box. Compatible Partial. Purpose-built tank. Pre-integrated power skid Adjacent. Power-side only. Adjacent. Power-side only. Adjacent. Power-side only. Prefab white-space pod Native. Secondary loop pre-plumbed. Compatible. Hybrid deployments common. Rare. Different form factor. Multi-pod modular hall Native. Facility water loop scaled. Compatible. Hybrid deployments. Rare. Different hall design. Factory-built shell / campus Native. Distribution mains + CDUs. Compatible. Retrofit path viable. Partial. Separate immersion halls. Native. Full integration. Partial. Limited to specific configurations. Adjacent. Power-side compatibility, not cooling-side. Rare. Different form factor or hall design. Reading the matrix: DTC and RDHx integrate natively into white-space pods and multi-pod halls. Immersion occupies its own product class; pod-plus-hall architectures stay DTC-centric. Compatibility levels reflect current vendor product configurations 2024-2026. Author interpretation, not an industry-standard classification.
DTC integrates most naturally into prefabricated white-space pods and multi-pod halls, which is why these product families (Schneider EcoStruxure Pod, Vertiv SmartMod Max, Rittal high-density) can be configured around direct-to-chip liquid-cooling architectures, with the degree of factory integration varying by product and configuration. Immersion occupies its own product class; the pod-plus-hall stack stays DTC-centric.

In-pod CDU versus central perimeter CDU. The branches below hold different rack-footprint and operational trade-offs (Figure 3b). In-pod CDU (Vertiv SmartMod Max CW, first-generation Schneider EcoStruxure Pod) consumes 1-2 rack slots and caps at the unit rating; central perimeter CDU (~1-2 MW class and above) leaves the pod as a manifold-only assembly and preserves every rack footprint for compute.

Figure 3b
In-pod CDU versus central perimeter CDU
ARCHITECTURE A In-pod CDU CDU 1-2 rack widths consumed Rack row A Rack row B Water in Return ARCHITECTURE B Manifold-only pod + central CDU Rack row A Rack row B Manifold only Central perimeter CDU ~1-2 MW class Trade-offs: Rack footprint impact: In-pod consumes 1-2 rack slots; central preserves every slot for compute. Primary-side maintenance: In-pod puts primary glycol inside the IT aisle; central keeps it in a service gallery. Thermal cap: In-pod caps at the CDU's single-unit thermal rating; central scales via the 1-2 MW+ perimeter unit. When each fits: In-pod suits edge and mid-scale where no primary loop exists. Central suits high-density greenfield hyperscale AI. Capex-per-rack implication: Each stranded rack slot represents foregone compute value in the tens of thousands of dollars per kW on a rough basis.
Left: the in-pod CDU consumes 1-2 rack slots and caps at its own thermal rating. Right: the manifold-only pod preserves every rack for compute and scales through a central perimeter CDU. The choice is architectural, with direct capex-per-rack consequences.

AC busway versus DC bus at the grey-to-white handoff. At 100-132 kW per rack, the current handled by a 415/480 V AC distribution architecture becomes materially larger than in an 800 VDC architecture, increasing conductor cross-section, busway weight, and tap-off burden on overhead pod trusses. Figure 3c shows what a wider 800 VDC deployment would change inside the grey-space skid topology.

Figure 3c
What 800 VDC changes inside the grey-space skid
TODAY AC-native grey-space skid MV/LV transformer LV AC switchgear AC UPS rectifier + battery inverter AC busway out In place today: MV/LV transformer, LV AC main switchgear, AC UPS with rectifier + battery + inverter, LV AC circuit-breaker lineup, AC busway. Manufacturing line and supply chain are optimised around AC power electronics and AC protection. FUTURE (800 VDC LVDC / MT DIABLO) DC-native grey-space skid MV/LV transformer Active front-end rectifier DC UPS direct battery bus 800 V DC bus out Replaced or displaced: LV AC switchgear, AC UPS rectifier+inverter, LV AC circuit-breaker lineups give way to active front-end rectifier, DC UPS on direct battery bus, and solid-state DC breakers or high-speed hybrid disconnects (DC arcs lack the natural zero-crossings that AC breakers rely on for arc extinction). Consequences: Manufacturing: a skid line optimised around AC needs substantial re-tooling to serve a native 800 VDC campus. Incumbents that also hold DC power-electronics capability (Eaton, ABB, Delta) hold option value under the OCP LVDC trajectory. Coordinated procurement: grey-space skids that contain the central rectifier block change the LV output specification of the pod, so the categories increasingly need to be procured as a coordinated pair; independent procurement loses the integration benefit. Working example: Delta InfraSuite Prefabricated AI MDC integrates 800 VDC in-row power with GoCool 260 kW LTA and 3 MW LTL cooling in one prefabricated unit; the convergence is visible in a shipping product, not just a specification document. Google, Microsoft, and NVIDIA are working toward common 800 VDC requirements including a side-power-rack route from 480 VAC and a longer-term MVAC-to-800-VDC direct-conversion path. See the DC-DC Transition series for the deeper treatment.
Left: the AC-native grey-space skid as commonly manufactured today. Right: what an 800 VDC skid would replace or displace. The manufacturing line change is one reason the modular incumbents that also hold DC power-electronics capability hold option value on the LVDC trajectory.

Fabric topology dictates pod geometry. Pod dimensions (rack count, aisle spacing, cable-tray height) are set by network fabric topology and signal integrity (mechanical airflow or pipe friction stays a secondary input). Figure 3d shows why pod sizing clusters at 8, 16, and 32 racks.

Figure 3d
Fabric topology and pod geometry. Rack counts cluster where NVLink and InfiniBand allow
8-RACK POD NVLink DAC intra-rack + adjacent copper Single NVLink domain, short-reach copper only 16-RACK POD Copper + InfiniBand rails Multiple NVLink domains linked by rail-optimised InfiniBand fabric or Ethernet spine 32-RACK POD Optical extension needed Copper reach exceeded at pod edges; optics hold higher power draw and add latency Copper DAC. Practical reach on the order of a few metres depending on cable generation, signalling rate, and passive vs active construction. Optical transceivers. Extend reach; add power draw and latency; drive up bill of materials at pod scale. Rack counts cluster at 8, 16, and 32 to align with NVLink domain sizes, InfiniBand rail counts, and optical insertion-loss budgets; pod vendor structural preferences get secondary weight.
Rack counts cluster where fabric topology and copper reach permit. The 8-rack pod fits inside a single NVLink domain on copper. The 16-rack pod needs InfiniBand rails or Ethernet spine to link multiple domains. The 32-rack pod requires optical transceivers at pod edges, which costs power and adds latency.

Volumetric pods versus flat-pack cassette pods. The split runs on logistics:

DimensionVolumetric podFlat-pack cassette pod
Ships asAssembled steel-frame room, racks, containment, (with in-pod CDU) fluid loop pre-installedContainment, manifolds, and rack skeletons shipped flat
On-site scopeOversize transport, heavy crane access, single lift-and-setErected on-site over roughly 72 hours by a small integrator crew
Best fitGreenfield hyperscale campuses where transport and crane access can be plannedHyperscaler powered-shell campuses where the shell already exists and the delivery footprint is constrained
Trade-offMaximum factory integration; permit-wall exposure on wide-load transportTrades some factory integration for logistics simplicity

Cooling-architecture integration summary (Figure 4 covers compatibility matrix). Direct-to-chip liquid cooling integrates through a factory-plumbed secondary loop, a pod-sized CDU (or manifold to a central CDU), cold-plate quick-disconnects, and rack + pod leak detection. Rear-door heat exchangers replace the standard rack door and reject heat into a facility water loop with bolt-on compatibility across every modular class. Immersion is a different form factor with compute submerged in dielectric fluid; modular immersion halls (Submer, Green Revolution Cooling reference designs) constitute their own product class; pod-plus-hall architectures stay DTC-centric.

04Why modular now

The AI buildout is pulling modular procurement into mainstream hyperscale delivery through four converging pressures. Naming them separately helps avoid the trap of treating cooling as the sole driver.

Figure 5
Why modular now. Power delivery at MW volume, delivered fast, factory-tested
Campus needs tens to hundreds of MW Hyperscale AI buildout Reliable power at rack Requires transformer, switchgear, UPS, battery, protection On-site assembly across dozens of instances is slow, error-prone, labour-constrained Factory-assembled power skid Factory-tested reliability envelope; predictable Speed of deployment Ground-break to first MW months, not years Interface ownership LV busway, MV feed, controls, protection Interconnection queue Still the multi-year critical path in constrained ISOs White-space adjacency Cooling appears in pods that house the racks The corrected causal chain: AI campus needs MW at scale, delivered fast. Reliable power at the rack requires the full stack (transformer + switchgear + UPS + battery + protection) coordinated together. Assembling that stack dozens of times on the same slab is slow and error-prone. Factory assembly of the stack as one tested skid gives speed, predictable reliability, and interface ownership. Cooling integration in the pod is a specific adjacency for the white-space category. The origin of the modular category comes from the power side; cooling integration adds the white-space adjacency. Interconnection queue remains the multi-year critical path even where modular hardware is fabricated in months.
The modular data centre category exists because MW-volume power delivery can be faster and more repeatably qualified when assembled at the factory; site-based assembly stays slower and less repeatable, with the economic outcome depending on project scale and logistics. The AI density transition adds the white-space pod as a growing adjacency, where cooling integration becomes valuable because the pod contains the racks. In the vendor field examined here, the power side appears to account for most merchant volume.

1. Time-to-market compression. Traditional field-built power and IT-hall infrastructure sequences steel erectors, cable technicians, electricians, mechanical pipefitters, and controls integrators across the same slab. Prefabricating shifts that coordination into controlled factory conditions. A hyperscale AI campus requires tens to hundreds of megawatts of electrical capacity, with the largest campuses extending beyond 500 MW. Assembling the electrical plant in parallel at factory scale is materially faster than sequencing dozens of trades on the same site.

2. Factory-tested reliability envelope. Reliable power at the rack requires transformer, switchgear, UPS, battery, and protection coordination all tuned together. When the operator specifies a factory-tested unit, the reliability range is inherited from the vendor qualification programme; on-site commissioning reconstruction stays slower. Underwriting shifts from site-specific unknown to vendor-tested known. This is the core power-side driver, and it is why grey-space skids attract the merchant volume.

3. Skilled labour shortage in field trades. Secondary and tertiary data-centre markets (Iberia, Nordics, US Midwest, tier-2 APAC, sovereign programme sites) face acute shortages of qualified electrical and mechanical trades. Factory-assembled units convert a skilled-labour problem at the site into a manageable installation-and-commissioning problem. The bottleneck affects enterprise and mid-tier operators as much as hyperscalers, and appears to be intensifying through 2027-2030; easing of the constraint stays absent from current signals.

4. Standardised reproducibility (design one, build many). Hyperscale campuses require identical pod and skid layouts across regions to simplify DCIM integration, structural loading, fire suppression zones, and maintenance operations. Reference designs propagate: what a hyperscaler standardises becomes accessible to the mid-tier and enterprise field through vendor product portfolios. This is the mechanism that makes hyperscale-grade modular economically reachable outside hyperscale operators ( ).

The white-space cooling adjacency. At 100 kW-plus per rack, direct-to-chip liquid cooling becomes practical and, at the high end, necessary. Racks and cooling then have to be qualified together, which is why the white-space pod category grew. 100 kW/rack functions as a practical marker for the density regime; a hard engineering threshold would be a different claim; the relationship is continuous.

Interconnection remains the multi-year critical path. Modular does not compress utility interconnection queues. ERCOT is redesigning its large-load interconnection process against a pipeline of more than 438 GW of tracked large-load requests, nearly 89% from data centres, with the Batch Zero process introduced in 2026 to evaluate qualified projects at or above 75 MW by study maturity and commitment criteria. In constrained markets, ground-break to revenue-ready can still run 24-48 months or longer even when modular hardware is fabricated in months.

05The modular build timeline

Modular compresses construction time. It does not compress energisation or utility interconnection. Ground-break to first MW of commissioned electrical capacity is a shorter interval than ground-break to revenue-generating IT load. The three intervals respond to different levers.

Figure 6
Timeline decomposition. Construction, energisation, and revenue-ready are separate intervals
0 6 12 18 24 30 36 mo Stick-built (traditional) Civil + shell + MEP IT fit-out Commissioning Interconnect wait Modular skid + pod Civil (parallel) Assembly Commissioning Interconnect wait (typically 24-36+ mo in constrained ISOs) Standardised sub-components Site prep Install Commis. Interconnect wait (dominates go-live) Reading the visual: Modular compresses the civil/shell/MEP and IT fit-out phases by parallelising factory work with on-site civils. Commissioning shortens but does not go to zero: on-site electrical, cooling loop, and integration commissioning remain. Interconnection queue is the binding constraint. Ground-break to revenue-ready is dominated by grid connection timeline in most ISOs. Timeline bands from vendor and operator disclosure 2024-2026. Actual project timelines vary substantially by site, jurisdiction, and interconnection queue position.
Construction time, energisation time, and revenue-ready time measure different things. Modular procurement moves the construction phase from serial site work to parallel factory work, but interconnection queue and commissioning both remain on the critical path.

Chart 1. Third-party estimates of global modular data centre market, 2024-2034

PUBLISHED ESTIMATEPublished third-party estimates cluster around ~$40B at the 2026 starting point, but category definitions vary materially. MarketsandMarkets: ~$41B in 2026 rising to ~$93.6B by 2031 (~18% CAGR). Fortune Business Insights: ~$145.35B by 2034 (~17.2% CAGR). Straits Research and Mordor Intelligence project intermediate paths. The spread reflects different segmentation (some include air-cooled containers, some exclude), different geographic scopes, and different assumptions on AI capex conversion into modular procurement. These estimates do not add together and comparability across sources stays limited; the chart illustrates the direction of published market estimates; a market-size consensus has yet to form.

05bBoundary friction: where the composed campus fails at the flange

The composed campus fails during construction and commissioning at specific boundaries where vendor scope explicitly ends. Naming them together helps the operator specification stage; each gets a longer treatment downstream.

1. The civil boundary, where concentrated rolling weight meets slab-loading limits. A pod populated with fully-equipped liquid-cooled AI racks can push rack-point and concentrated floor loads far beyond legacy raised-floor designs. Depending on the rack and cooling configuration, individual rack footprints can approach the tonne-plus range, materially higher than air-cooled predecessors. Legacy 24-inch raised floors may require reinforcement or replacement; heavy-duty raised-floor systems vary substantially in load rating and support configuration. Modern deployments increasingly go directly on reinforced slab-on-grade with embedded steel channels, or on dedicated heavy structural skids. Retrofit deployments treat floor rebuild as a first-day scope item. Deep-dive.

2. The hydronic boundary, where the primary facility loop hands off to the secondary technology cooling system. Grey-space skids terminate at the primary loop side, in carbon-steel pipe holding raw chilled water or condenser water. White-space pods hold the technology cooling system (TCS) in stainless steel, typically deionised water or ~25% propylene glycol, with treated biocides and 50-micron secondary filtration, feeding into nickel and copper microchannel cold plates on the GPUs. Chemical passivation of the secondary loop, particulate certification, and helium leak testing before pod energisation are procurement requirements. Deep-dive.

3. The electrical boundary, where AC busway bulk gives way to DC busway weight and the safety profile changes. A 415 or 480 V three-phase busway at 100-132 kW per rack requires copper cross-sections and tap-off cables that stress overhead pod trusses on weight and bend radius. The shift toward 800 VDC (bipolar ±400 V or 0-800 V configurations, per OCP LVDC and Mt Diablo work) at the grey-to-white handoff reduces current for a given power transfer, shrinks conductor weight, and changes the arc-flash, touch-potential, and protection coordination scope. Skid switchboard termination and busway head-end tap-off are separate warranty stops. Deep-dive and the DC-DC Transition series.

4. The logistical boundary, where road-haul constraints bound modular unit sizing. Volumetric pods wider than roughly 3.65 m or taller than roughly 4.1 m trigger wide-load escorts, permits, and route surveys, which is what pushes larger deployments toward flat-pack cassette architectures. The permit wall is why some hyperscaler powered-shell campuses standardise on flat-pack cassette pods that erect on-site in roughly 72 hours, at the cost of more on-site scope than a volumetric pod would hold. Deep-dive and .

These four boundaries also determine which vendor category attracts which acquisition capital, which covers next.

06The incumbents are moving up the integration layer

The 2024-2026 window saw five major transactions along the integration layer. Each pursued the buildout through a different transaction structure, and each transaction maps directly onto the grey-space and white-space categorisation.

Figure 7
Incumbent moves 2024-2026
What they bought / partnered Layer captured Why it matters Eaton INVESTMENT NordicEPOD (49% stake, May 2024) ACQUISITION Fibrebond ($1.4B, April 2025) Pre-integrated power skid manufacturing at scale (Fibrebond: ~$378M rev, ~$110M EBITDA TTM Feb 25) Owns Category B skid interface to hyperscaler electrical spec. Nordic + US manufacturing footprint covers EMEA + NA. Schneider PARTNERSHIP EcoStruxure Pod + Compass Datacenters joint launch (Sept 9 2025) Volume commit at scale Prefab white-space pod at hyperscale scale (up to 42 racks per pod, 1 MW+, hybrid liquid-air) Pairs pod supplier (Schneider) with operator (Compass) at spec. Locks in white-space interface at hyperscale volume commit. Vertiv PRODUCT LINE SmartMod family expansion (Max DX/CW, Combo variants) SERVICES ACQUISITION PurgeRite (~$1B + $250M earnout, Dec 2025) Modular white-space + hall. Liquid cooling services layer (fluid management, purging, filtration) via PurgeRite. Services + product combination. PurgeRite covers ongoing liquid cooling lifecycle rather than the modular product itself. All transaction data from Eaton IR, Schneider IR, Vertiv IR press releases and SEC filings 2024-2025. Fibrebond financials from Eaton acquisition disclosure. PurgeRite deal announced Nov 4 2025, closed Dec 4 2025. Reviewer note: PurgeRite is a liquid-cooling services business, separate from SmartMod modular product line.
The transaction structures are marked with badges on each cell to keep them visually distinct. Eaton combined an investment (NordicEPOD minority stake) with an outright acquisition (Fibrebond) to buy manufacturing scale in pre-integrated power skids across two geographies. Schneider chose a partnership with a hyperscale operator (Compass) to lock in the white-space interface at volume without owning the operator. Vertiv extended the longer-running SmartMod product line and separately made a services-business acquisition (PurgeRite) covering the liquid-cooling lifecycle. The incumbents and their value-capture theses.

Eaton + NordicEPOD (grey-space). PUBLIC FACTIn May 2024, Eaton took a 49% strategic minority stake in NordicEPOD AS, a Norwegian JV with CTS Nordics that designs and assembles standardised power modules for European data centres. The 2024 NordicEPOD configurations described by Eaton supported up to 2 MW of electrical power per unit. Eaton's current NordicEPOD product material describes standard 1.7 MW and 2.0 MW configurations, with custom designs up to 3.1 MW. Eaton and NordicEPOD announced the official opening of the Oslo factory on September 26, 2024. Grey-space category, European hyperscale market.

Eaton + Fibrebond (grey-space). PUBLIC FACTEaton announced the Fibrebond acquisition on March 11, 2025, and closed on April 1, 2025, for $1.4 billion in announced purchase consideration. Fibrebond generated approximately $378 million in revenue and approximately $110 million in adjusted EBITDA for the twelve months ending February 2025 per Eaton's acquisition disclosure. Grey-space category, US hyperscale manufacturing footprint. Between NordicEPOD and Fibrebond, Eaton assembled a substantial grey-space manufacturing footprint across EMEA and North America.

Schneider + Compass Datacenters (white-space). PUBLIC FACTOn September 9, 2025, Schneider Electric and Compass Datacenters jointly announced a prefabricated modular EcoStruxure Pod for white-space fit-out. Schneider describes configurations up to 42 racks at 132 kW per rack, with hybrid liquid-air cooling and a technical water loop pre-plumbed for direct-to-chip integration; actual pod power depends on configured rack count and rack-level density. Schneider began manufacturing the pods for Compass in fall 2025. White-space category, delivered at hyperscale volume through the operator partnership.

Vertiv SmartMod (both categories). PUBLIC FACTVertiv has expanded the longer-running SmartMod family with higher-capacity configurations. SmartMod Max supports up to 200 kW; Max DX supports up to 26 racks and Max CW up to 24 racks. SmartMod Combo extends the architecture to larger multi-module deployments. SmartMod Max CW was originally introduced in 2023, so the 2024-2025 window represented product-line expansion; initial launch dates fall earlier in the catalogue. Vertiv covers both categories through variants.

Vertiv + PurgeRite (cooling services adjacency). PUBLIC FACTOn November 4, 2025, Vertiv announced its intent to acquire PurgeRite, and completed the acquisition on December 4, 2025 for approximately $1 billion in cash plus up to $250 million in additional consideration based on 2026 performance metrics. PurgeRite provides specialised fluid management services (mechanical flushing, purging, filtration) for liquid cooling systems. PurgeRite is a lifecycle-services business; the modular product line stays with SmartMod and Motivair. The acquisition runs alongside the SmartMod product family and extends Vertiv into the ongoing thermal-management services layer that operating liquid-cooled facilities require. Not a modular acquisition in itself; it complements the white-space pod product family with services capability.

Ecolab + CoolIT (white-space thermal). PUBLIC FACTEcolab completed its acquisition of CoolIT Systems for approximately $4.75 billion on July 2, 2026. Unlike the power-side transactions, this is a direct bet on the liquid-cooling interface itself: CDUs, cold plates, and associated thermal infrastructure connect at the pod-to-facility water interface that Figure 4 identifies. Ecolab described the CoolIT acquisition as the platform for an AI-cooling business targeting ~$4 billion by 2030 (per Ecolab IR release). This is the clearest recent transaction showing the white-space thermal interface has become an acquisition target of its own, and it belongs alongside the 2024-2025 power-side transactions; the forward consolidation frontier is a different timeline.

What each transaction targets. Reading the five transactions together sharpens the pattern. Eaton (Fibrebond + NordicEPOD) solidifies the grey-space MW engine of factory-built power modules at hyperscale volume. Schneider (EcoStruxure Pod with Compass) captures the prefabricated white-space integration layer through a hyperscale operator partnership. Vertiv (SmartMod + PurgeRite) covers both categories on the product side and layers on the operational bottleneck of fluid flushing, filtration, and commissioning services on the services side. Ecolab (CoolIT) buys the white-space fluid interface and its consumables and services stream directly. The five transactions cover the modular product value chain across grey and white space, add operational-services capability, and stake out the thermal interface as a direct target.

Hyperscaler internal programmes. Microsoft has publicly described its Fairwater AI datacentre architecture. Meta contributes open infrastructure specifications through the Open Compute Project. Google publishes detailed TPU system and pod architectures. These programmes give hyperscaler architecture teams significant specification power over the modular products they procure from incumbent vendors.

07The manufacturing footprint

Where modular is built matters as much as who builds it. Manufacturing location determines transport constraints, tariff exposure, labour cost, factory lead time, and the physical dimensions the vendor can ship in one piece.

Figure 8
Global manufacturing anchors for modular data centre products
NORTH AMERICA Fibrebond (Minden, Louisiana) Eaton subsidiary. Approximately $378M TTM revenue. Pre-integrated power enclosures at scale. Schneider Andover MA + Vertiv US EcoStruxure Pod assembly for Compass campuses. SmartMod North American production. Applied Digital (Ellendale, Jamestown ND) PowerPod internal-design production. EUROPE NordicEPOD (Oslo, Norway) Eaton + CTS Nordics JV. Factory opened Sept 26 2024. 1.7 MW and 2.0 MW standard, up to 3.1 MW custom. Rittal (Herborn, Germany) High-density modular halls with liquid-cooling integration. DataQube (UK, Northamptonshire) Metro-scale modular for European deployments. ASIA PACIFIC Delta Electronics (Taiwan primary) Expanding into India and Thailand. Full modular product line at scale. Vertiv APAC facilities SmartMod production for regional demand. Huawei DC infrastructure Chinese domestic. Atlas SuperPoD compute side. Second-order consequences of manufacturing location: Tariff exposure. US IRA production-linked credits favour US-manufactured modules for domestic AI campuses. EU CBAM begins to price embodied emissions in imported prefab from 2027. Regional labour cost. Modular assembly labour is a material share of total module cost. Norwegian and German rates run above Louisiana and Texas rates, and the differential feeds through to standard-configuration pricing. Transport corridor design. Manufacturing location bounds shippable dimensions per unit. North American designs are optimised for interstate corridors. European designs face tighter road-width constraints in the source jurisdiction. Ownership and revenue anchors from corporate filings and IR disclosures. Factory locations from vendor product pages 2024-2026.
Manufacturing footprint is a structural feature of the vendor field. Where a vendor builds determines what it can ship, what tariff regime the module falls under, and how quickly the vendor can respond to a customer order.

Tariff and trade dynamics. US manufacturing incentives, domestic-content requirements, and customer procurement preferences can affect the delivered economics of modular electrical equipment sourced for domestic AI campuses. Specific IRA credits apply to defined equipment categories and qualification mechanisms; AI infrastructure generically does not qualify. In Europe, CBAM's definitive regime began in 2026 and covers specified sectors including iron and steel, aluminium, cement, fertilisers, electricity, and hydrogen. Where imported modular construction inputs fall within covered steel or aluminium categories, embedded-carbon costs can affect the delivered economics of the module into EU projects.

Regional labour cost differential. Modular assembly labour is a material share of total module cost. Regional labour costs are one input into modular assembly economics. The resulting trade-off across the vendor field is between larger modules that amortise factory labour and logistics over more MW, and smaller or more standardised modules that support higher production throughput.

Transport-corridor design as engineering constraint. Manufacturing location bounds what dimensions the vendor can ship in one piece. North American transport corridors impose route-specific height, width, length, and weight limits, with larger modules often requiring specialised permits, escorts, and route surveys. European road corridors face similarly route-specific constraints, often favouring smaller shippable modules where access roads, bridges, or urban geometry limit transport footprint.

Upstream supply-chain constraints modular procurement cannot solve. Large power transformers (LPTs) at 2.5-4 MVA class face lead times of roughly 80-160 weeks driven by grain-oriented electrical steel (GOES) shortages (reaching back into iron-ore and cold-rolling capacity in China, Japan, Korea, and India), core-winding bottlenecks, and test-bay queues at the transformer OEMs. Low-voltage side, high-interrupt breakers (4,000-5,000 A frame sizes with 100 kA interrupt ratings) run 40-60 weeks and longer. A pre-integrated power skid still contains a full-size MV/LV transformer and full-rated LV switchgear. Packaging those components onto a skid in Louisiana or Norway does not bypass the upstream physics: modularity compresses on-site scheduling risk, not macro BOM procurement lead times. Domestic-content requirements (US IRA-adjacent procurement preferences, EU CBAM effects on imported components, sovereign-programme localisation rules) restructure the delivered economics further.

Maintenance and field serviceability (mean-time-to-repair). Factory integration improves initial QA and deployment speed but introduces field-service complexity. In a traditional stick-built electrical room, a failed 3,500 kVA dry-type transformer or a 4,000 A breaker at Year 7 or Year 10 rolls out along a wide maintenance corridor with overhead monorail hoist access. Working clearances around switchgear and battery compartments in a stick-built room are typically comfortable above NFPA 70E and NEC minimums. In a tightly packed modular enclosure, working spaces are engineered to close to the bare minimum for those same NFPA 70E and NEC clearances, and replacing the same component often requires unbolting outer weatherproof panels, staging exterior mobile cranes, and taking an entire modular bay or adjacent bus duct offline for the duration. For Tier III or IV operations, tightly coupled modular geometry can trade upfront build velocity against 15-plus years of operational maintenance friction. Operators procuring modular should evaluate the vendor's regional service footprint, spare-parts availability, hot-swap architecture, and maintenance-clearance drawings as first-class procurement inputs, alongside capex and delivery timeline.

Structural floor loading and the civil interface. A high-density AI pod populated with liquid-cooled iron can drive per-rack footprint loads beyond the rating of some legacy raised-access floors, requiring reinforcement or a slab-based installation. White-space pods increasingly go on reinforced slab-on-grade with embedded steel tracks, or on dedicated heavy structural skids. Retrofit deployments often need floor rebuild before pod placement, which is a hidden cost in the retrofit-vs-greenfield decision. Volumetric pods wider than roughly 3.65 m or taller than roughly 4.1 m typically trigger wide-load escorts, route surveys, and specialised transport that flat-pack cassettes can avoid at the cost of more on-site erection scope.

08The vendor field, categorised

Reading the vendor field is easier when categorised by the layer of the modular stack each player addresses. The revised categorisation makes the grey-space and white-space split explicit.

Figure 9
Vendor field by category
CATEGORY 1 Modular infrastructure vendors Supply power modules, white-space pods, and multi-pod halls as merchant products. Eaton (Fibrebond + NordicEPOD) Power skid focus; largest data-centre M&A commit in the space Schneider Electric (EcoStruxure Pod) White-space pod focus; Compass partnership Vertiv (SmartMod), Delta (updated modular), Rittal (liquid-cooled) Full product line ranging across power + IT hall CATEGORY 2 Operator-integrated platforms Data-centre operators using standardised campus designs. Buy from Category 1 or hyperscaler internal. Compass Datacenters Ontario Teachers, Brookfield, KKR backed. Co-designed Schneider pod. Vantage Data Centers DigitalBridge-backed; multi-continent AI-scale portfolio DataBank, DigitalBridge platforms North American colocation with pre-fabricated site programmes CATEGORY 3 Compute-system pod architectures Full system-level integration (compute + cooling + power in one unit). Different taxonomy from infrastructure modular. Huawei Atlas SuperPoD family Atlas 950 (8,192 Ascend NPUs); Atlas 960 (15,488); Atlas 960E (4,096 single memory pool) Announced at Huawei Connect 2025-2026. Chinese domestic focus. NVIDIA DGX SuperPOD reference designs Specify compute + cooling + interconnect; sold via partners. CATEGORY 4 Edge / specialty Containerised and metro-scale deployments. Smaller than hyperscale, different procurement dynamics. DENSO EdgeCool Split-system rack-level cooling from automotive thermal IP. DataQube UK-based pre-fab specialist; metro and edge deployments. Edge-focused OEMs Containerised at 100-500 kW; sovereign AI and industrial deployments
Categorising the vendor field prevents taxonomy drift. Category 1 (infrastructure vendors) captured most of the recent incumbent transactions examined here. Category 2 (operator-integrated) has become an important route to hyperscaler volume commitments. Category 3 (compute-system pods) is a different product class, where NVIDIA and Huawei reference architectures address rack-scale AI infrastructure; the broader facility-modular stack stays outside their scope. Category 4 (edge/specialty) has different procurement dynamics and is generally oriented toward edge and specialty deployments.

09The campus composes multiple vendor products

The essay's central point for procurement: a hyperscale AI campus is composed of products from several vendors across the categories in Figure 1. Figure 10 illustrates one four-vendor composition; the point is that compositional procurement across categories describes the campus better than a specific vendor count.

Figure 10
A composed AI campus. Where each modular product fits
Utility MV feed Grid interconnect Site-built, not modular Power skid Eaton (Fibrebond) Vendor 1 · category 1 MV/LV transformer + UPS + switchgear White-space pod Schneider EcoStruxure Vendor 2 · category 1 IT hall block with cooling loop pre-plumbed GPU racks NVIDIA GB300 100+ kW/rack Factory-built hall / campus shell Compass Datacenters (with Schneider), Vantage, DataBank platforms Vendor 3 · category 2 (operator-integrated). Wraps the power skid + pod into a factory-built shell + MEP. READING THE VISUAL: A hyperscale AI campus can procure a power skid, a white- space pod, and a shell from three different vendors. Each vendor owns one interface layer. Interface qualification is where the incumbent M&A capital returns. The composition rule: Category 1 (power skid) + Category 1 (white-space pod) = the electrical + IT hall stack. Category 2 (operator-integrated hall) wraps the two above into a factory-built shell. Vendors that ship against the full stack capture more content per rack than vendors that ship individual components. This is the direct commercial analytical lens for Eaton + Schneider + Vertiv M&A moves.
Compositional procurement is the essay's central thesis. A hyperscale AI campus is a composition of several vendors (not a single-vendor product) across power, white space, cooling across power, white space, cooling and shell infrastructure, with different vendors controlling different interface layers. The incumbent M&A moves are best read as bids for interface ownership at different points in the stack.

The interface question that Figure 10 raises. When Eaton delivers a power skid, Schneider delivers a white-space pod, and Compass delivers the shell, no single vendor has warranted the interface between them. Insurance-stack thinking, commissioning discipline, and interface qualification pick up from here. See for the detailed treatment.

10Prefab product categories with capex and timeline ranges

The three main modular product categories with typical capex and timeline ranges. Denominators (MW electrical vs MW IT vs MW facility) are made explicit because they measure different quantities.

CategoryDenominatorIndicative capexIndicative timeline
Grey-space power skid
Factory-assembled electrical plant: transformer, UPS, switchgear, controls. Eaton Fibrebond/NordicEPOD, Delta, ABB modular skids, Siemens Sivacon.
Per MW electrical capacity AUTHOR SCENARIO~$2-4M per MW electrical, excluding site prep, land, and utility upgrades AUTHOR SCENARIO6-12 mo factory to on-site energised, plus 2-3 mo on-site integration; ranges vary by module size and site condition
White-space pod
Factory-fitted IT hall block: racks, containment, cooling, busway, cabling. Schneider EcoStruxure, Vertiv SmartMod Max, Huawei FusionModule, Rittal, Delta AI MDC.
Per MW IT load AUTHOR SCENARIO~$3-6M per MW IT load, pod scope only (racks, containment, in-row cooling, busway, cabling); cooling configuration drives the spread AUTHOR SCENARIO9-14 mo factory to site-ready, plus 1-2 mo final commissioning; cooling architecture drives the spread
Prefab factory-built hall / campus
Factory-manufactured shell + MEP + IT hall in sections. Compass (with Schneider), Vantage, DigitalBridge/DataBank, hyperscaler internal.
Per MW facility load AUTHOR SCENARIO~$8-12M per MW of facility capacity, covering shell + MEP + IT hall fit-out; excludes land, utility interconnection, generators, and IT compute; jurisdiction and cooling architecture drive variance AUTHOR SCENARIO12-18 mo ground-break to first MW under favourable interconnection conditions; assumes interconnection application has been sequenced in advance

Capex and timeline ranges are AUTHOR SCENARIOS synthesised from publicly disclosed vendor configurations, published operator commentary, and anonymised DD engagements 2024-2026. Denominators and scope are stated explicitly in each cell to prevent apples-to-oranges comparison. Actual project economics vary substantially by scale, cooling configuration, jurisdiction, and interconnection queue position.

11A worked example. Illustrative 100 MW AI campus

AUTHOR SCENARIOTo make the compositional procurement thesis concrete, consider one illustrative 100 MW facility / approximately 80 MW IT-load AI campus in a constrained ISO. The facility total covers utility interconnection and site infrastructure; the 80 MW is what reaches the IT racks after conversion, cooling, and support-load overhead. The 80 MW IT figure represents an illustrative 80% facility-to-IT allocation for this worked example. The split covers UPS losses (and does not represent a PUE claim), distribution losses, cooling plant, pumps and fans, controls, and miscellaneous facility load. The bill of materials below is a synthesised range built from vendor pricing, published operator commentary, and anonymised DD engagements 2024-2026. It is illustrative; empirical measurement at this granularity requires different source data.

Campus layerVendor role and scopeIllustrative capex range
Land + utility interconnectionSite acquisition, permitting, substation upgrade, utility EPC engagement, interconnection deposit$120-220M
Substation + primary distributionSubstation OEM (Siemens Energy, GE Vernova, Hitachi Energy) plus primary switchgear$50-80M
Grey-space power skidsEaton/Fibrebond/NordicEPOD-type power modules, illustrated as approximately 40 modules at 2.5 MW each to cover the 100 MW electrical scope$200-400M
White-space podsSchneider EcoStruxure Pod or Vertiv SmartMod Max approximately 50 pods at 1 MW IT load each$250-500M
Cooling infrastructureVertiv or CoolIT CDUs, facility water loop distribution mains, cooling tower or dry cooler plant, PurgeRite lifecycle services engagement$80-150M
Factory-built shell + MEPCompass Datacenters, Vantage, or DataBank campus programme. Includes shell, mechanical and electrical rooms, cabling infrastructure, security$200-350M
Owner and commissioning soft costsOwner engineering team, integrator, commissioning agent, interface qualification programme, insurance$50-100M
Total infrastructure (excl IT compute)Roughly $950-1,800M
IT compute (NVIDIA GB300 NVL72 systems, illustrative)If the entire 80 MW IT space were populated with GB300 NVL72-class racks at the cited maximum rack power (142 kW), the arithmetic gives roughly 560 racks and ~40,000 GPUs. A real campus mixes compute, storage, networking, and non-GPU loads, so the actual GPU count is lower and rack density varies materially by workload.See method note below
Total campus (infrastructure only)IT-compute capex depends on NVIDIA system pricing, which stays unpublished at list; the total-including-IT figure is deliberately omitted here.Roughly $950-1,800M infrastructure

Ranges reflect variance in cooling architecture selected, geographic jurisdiction, interconnection deposit terms, and vendor sourcing strategy. If the IT load were entirely configured around GB300 NVL72 racks at the published maximum rack power, roughly 560 racks and 40,000 GPUs would fit inside the 80 MW budget. This is an illustration only. A real campus mixes compute, storage, networking, and non-GPU loads, so the GPU count is lower and rack density varies materially by workload.

Figure 11
Illustrative campus infrastructure capex waterfall (100 MW facility, midpoint scenario)
CUMULATIVE INFRASTRUCTURE SPEND, MIDPOINT SCENARIO ($M) 0 100 300 500 700 900 1,100 1,300 1,500 $170M 12% Land + interconnect $65M 5% Substation $300M 22% Grey-space power skids $375M 27% White-space pods $115M 8% Cooling $275M 20% Shell + MEP $75M 5% Owner soft costs $1,375M 100% Infrastructure total Reading the waterfall: Grey-space power skids + white-space pods + cooling account for $790M / 57% of the infrastructure footprint in the midpoint scenario. This is where the incumbent vendor procurement spend concentrates.
Cumulative infrastructure spend for the illustrative 100 MW facility at midpoint of the ranges in the table. Land + interconnection + substation + grey-space power + white-space pods + cooling + shell + soft costs sum to roughly $1.375B. Each bar shows its dollar value and its percentage of the infrastructure total. IT compute (NVIDIA GB300 systems) stays outside this view because there is no defensible public list price; at hyperscaler procurement it typically dominates total campus capex.

Observations from the illustrative campus.

  1. Modular vendor spend concentrates in the grey-space, white-space and cooling layers. Grey-space power skid + white-space pod + cooling infrastructure ($530M-$1.05B combined range) accounts for a large share of the modular infrastructure procurement spend.
  2. Land + utility + substation offers no modular compression. This portion is entirely site-specific; modularity does not touch it.
  3. Commissioning is roughly 5-6% at the midpoint. It spans a wider band across the low and high ends of the scenario, and is material either way for the skilled-labour pipeline.
  4. Interface qualification stays outside the discrete-line-item treatment. Vendor-to-vendor interface qualification gets rolled into owner engineering and integrator soft costs; a separate procurement line stays unusual.
  5. IT compute dominates total campus capex. Modular procurement optimises the infrastructure range surrounding the IT; the IT compute itself stays unoptimised by this layer.
  6. Timeline runs 12-18 months to first MW under favourable conditions. Full 100 MW extends to 24-36 months or longer depending on interconnection queue position.

12Residual value, financing, and the secondary market

Modular units hold economic properties that stick-built shells do not. The comparison below runs across the procurement and financing dimensions where the two build types diverge.

DimensionModular equipment (skid, pod)Stick-built facility
Residual value / secondary market Redeployable to mid-tier, edge, industrial, or defence buyers when a colocation operator retires a facility. Potential secondary market; evidence today limited, observable pattern is intra-platform redeployment (Applied Digital PowerPod, Nordic operators redeploying NordicEPOD-type skids into non-DC industrial power). Electrical rooms and IT halls are tied to the shell. Cannot be redeployed; residual value at end-of-primary-use is near zero.
Depreciation treatment Where tax rules classify modular power and IT equipment separately from the structure, equipment can hold a shorter depreciation life. Treatment is jurisdiction- and asset-specific (permanence, ownership, lease structure, building-integration vs discrete-equipment classification). Financing benefit must be underwritten, not assumed. Real-estate depreciation schedules, longer life, integrated with the structure. Simpler classification but less flexible.
Financing structure Discrete equipment classification supports sale-leaseback and separate equipment financings distinct from the shell. Operator-integrated platforms are increasingly structuring modular procurement this way. Sale-leaseback of an integrated facility is more difficult because the equipment and shell financing are entangled. Typically single project-finance stack.
Currency and FX exposure Cross-border procurement (European operator buying US-manufactured, or US operator buying European or Chinese) holds FX exposure that appears in delivered economics. Local stick-build removes cross-border FX from the equipment side. The compute payload still holds FX.
Decommissioning and end-of-life Battery cabinets (Li-ion), coolant fluids (increasingly PFAS-regulated), copper busway, structured cabling each accessible for disassembly and recycling. Emerging as an ESG procurement input. Components entangled with structure. Each end-of-life pathway more expensive to disaggregate.
Figure 11b
Modular unit lifecycle: factory to secondary market
Factory build MV/LV skid or pod Factory QA, digital twin Deployment Ship, install, interface qualify, commission Operate (5-10 yr) Facility mgmt, thermal-mgmt services, refresh cycles Refresh / retire Technology cycle drives redeployment decision Secondary use Redeployment or component recycling RESIDUAL VALUE Residual value accrues across the operate stage and materialises at refresh: modular units can move to mid-tier, edge, industrial, or defence buyers; stick-built cannot. DEPRECIATION Where equipment classification holds, modular holds a shorter depreciation life than the structure. Sale-leaseback becomes practical for the discrete equipment while the shell finances separately. CURRENCY AND FX Cross-border modular procurement (EU-to-US, US-to-EU or China, sovereign programme buying imported) holds FX in the equipment layer; local stick-build does not. Compute payload still holds FX. DECOMMISSIONING Batteries (Li-ion), coolant fluids (PFAS-regulated increasingly), copper busway, and cabling are accessible for disassembly and recycling in modular units. Emerging ESG procurement input. FINANCING STRUCTURE Discrete equipment classification supports sale-leaseback structures; operator-integrated platforms increasingly finance modular equipment separately from the shell.
Modular units run through a lifecycle that is structurally different from stick-built shells. Residual value accrues, depreciation runs on a different schedule, currency exposure appears where the procurement crosses borders, decommissioning pathways stay open component-by-component, and financing structures can be equipment-based; integrated project finance stays an alternative.

The residual-value story is one reason some financing structures for modular procurement look more like equipment leasing and less like traditional data-centre project finance. It is also why some operators explicitly maintain vendor relationships across upgrade cycles; discrete-event procurement loses the install-base continuity.

13The residual constraints of modular procurement

Modular procurement introduces its own risks that operators need to price:

Transportation constraints. Bridge heights, road weight limits, tunnel clearances, and rail loading gauges bound how large any single shippable unit can be. Fibrebond's Louisiana manufacturing footprint supports certain module dimensions well; regional differences in road, rail, and bridge infrastructure feed back into how vendors size their standard configurations.

On-site staging complexity. Modular assembly is materially less complex than a fully stick-built campus, where dozens of trades sequence on the same slab; plug-and-play assumptions overshoot the current state. For example, an illustrative campus receiving dozens of skids plus multiple white-space pods plus multiple hall sections still needs staging area, crane access, coordination between modular vendor installers, and interface management. The compression comes from moving fabrication upstream, not from eliminating the assembly discipline; operators that read modular as plug-and-play typically encounter the interface layer at commissioning.

Regulatory, AHJ, and jurisdictional testing friction. Factory qualification (hipot testing, breaker injection, helium leak testing, arc-flash coordination) generates witness-test documentation that vendors present as evidence of site-ready equipment. Local Authorities Having Jurisdiction (AHJs) and utility inspectors frequently do not accept factory-stamped witness tests at face value. Depending on jurisdiction, they may require complete field re-testing, third-party field evaluations (UL/ETL field evaluations or equivalent regional accreditation), and local trade or union inspection before energisation. Common friction points in practice are (1) field labelling and NRTL listing on modified assemblies inside the skid, which can trigger an expensive third-party Field Evaluation if the whole-skid label is missing, and (2) grounding and protection coordination, where ground grids, earth-fault protection curves, and short-circuit withstand cannot be finally certified until the skid is bonded to the specific site MV utility characteristics and soil resistivity. The result is that some of the factory-commissioning gain gets consumed at the site by regulatory friction the vendor cannot solve for the operator. Operators should include AHJ acceptance testing scope in the procurement specification and budget the calendar time separately from the vendor commissioning window.

Interconnection queue. The utility interconnection queue for large data centre loads runs 24-48 months or longer in constrained ISOs. ERCOT and PJM ( ) are the North American cases. In Europe the queue map is more fragmented: ENTSO-E coordinates cross-border planning, but national TSOs (National Grid ESO in the UK, TenneT in the Netherlands and Germany, Amprion in Germany, Elia in Belgium, EirGrid in Ireland) each run distinct large-load connection processes with distinct queue times. Ireland's data-centre grid moratorium and Germany's Stromnetzausbau constrain volume differently again. The Nordic grid plus Nord Pool operates in yet another regime. For a modular operator sourcing across jurisdictions, the interconnection queue map is a first-order procurement input. A modular campus that assembles in 12 months and waits multi-year for interconnection has not saved go-live time. Sequencing the interconnection application ahead of the modular hardware order is what lets operators run the workstreams in parallel.

Retrofit versus greenfield. Modular procurement is dominantly a greenfield play, but the retrofit-vs-greenfield decision framework in the DC-DC Transition series covers cases where power skids and white-space pods drop into an existing shell that was previously stick-built. The retrofit-modular workflow trades module dimensions and interface constraints against the utility interconnection that the retrofit site already has. That trade works primarily where interconnection is scarce and the shell can accept the module dimensions without expensive rework.

Vendor lock-in on module spec. Once a campus is built around a specific vendor's skid or pod dimensions, cooling interface, and control system, expanding capacity typically means procuring from the same vendor. Operators should explicitly underwrite supplier longevity, service coverage, and replacement-path risk where a modular design creates vendor dependence. Dual-sourcing mitigates at the cost of interface complexity.

Commissioning skills. Prefab reduces on-site commissioning hours but does not eliminate them. On-site electrical, mechanical, cooling, controls, and integration commissioning still require skilled commissioning personnel. The DC-DC Transition series essay 12/13 covers the retraining requirement for 800 VDC work; the same constraint applies to liquid-cooling commissioning in modular halls.

14Who captures the value

Modularisation shifts value from individual equipment supply toward whoever owns the interfaces, qualification programme, and repeatable reference design. Figure 12 traces where in the modular product stack the vendor value gets captured and why that makes integration capabilities strategically valuable.

Figure 12
Value capture across the modular product stack
Component (breaker, fan, cable) Commodity margin. Interchangeable across vendors. Subsystem (UPS, CDU, PDU) Vendor-differentiated but component-interchangeable. Prefab module (skid, pod) Interface owner captures white-label integration margin. Integrated hall (skid + pod + shell) Whole-facility interface qualification. Multi-year hyperscaler contracts. Reference design + qualification programme Standardisation across N sites. Vendor content per rack scales with N. Highest economic-value capture. Low content per rack Moderate content per rack Higher content per rack Highest content per rack Recurring revenue as N grows The Eaton + Fibrebond + NordicEPOD, Schneider + Compass, and Vertiv + SmartMod + PurgeRite moves each buy access up this stack. Fibrebond gives Eaton the skid layer; the Compass partnership gives Schneider the integrated-hall layer via a hyperscale operator; PurgeRite gives Vertiv the recurring services layer around liquid cooling.
A vendor controlling more of the modular integration stack can capture more content per rack and potentially more of the standardisation-driven economic value available across N sites. This lens helps read the direction of recent incumbent transactions and one plausible mechanism through which further consolidation could occur as the market grows. Other mechanisms (capacity, manufacturing footprint, services revenue) also apply.
Figure 12b
The interfaces between the power chain, the cooling chain, and cross-cutting controls
POWER CHAIN Utility MV 11-33 kV feed A Grey-space skid Eaton / Delta / Flex B LV busway 415/480 V C White-space pod Schneider / Vertiv D Rack PDU Per-rack drop-out GPU rack NVIDIA GB300 NVL72 COOLING CHAIN Facility water Cold side E CDU CoolIT / Motivair F Secondary loop Pod-internal G Cold plate Rack-level, on GPU CONTROLS + COMMISSIONING BMS / DCIM Facility monitoring Protection coordination Arc-flash, breakers, SSCB Leak detection Drip pans, conductivity Life safety + fire Clean-agent, alarms Commissioning agent Interface qualification Insurance stack INTERFACE OWNERSHIP AT EACH JUNCTION A. Utility to skid: operator owns; utility warrants MV feed; skid vendor warrants input protection. B. Skid to busway: skid vendor warrants output; operator or GC owns busway routing and coordination. C. Busway to pod: pod vendor warrants input protection; interface qualification typically operator-owned. D. Pod to rack: pod vendor warrants internal PDU; GPU vendor warrants rack; operator owns coordination. E-G. Cooling interfaces: CDU vendor warrants CDU; pod vendor warrants secondary loop; cold-plate vendor warrants GPU-side; cross-vendor coordination almost always operator-owned. The interfaces marked A-G are where warranty gaps typically appear and where insurance-stack thinking becomes a first-class procurement input ( ).
Every campus has three chains running in parallel: the power chain (utility to rack), the cooling chain (facility water to cold plate), and the cross-cutting controls, commissioning, and insurance layer. Interfaces A through G are where vendor scope hands off. Each hand-off is a candidate for interface-ownership value capture, and a candidate for warranty ambiguity in the composed campus.

A short list of physical disconnect points produces most warranty and commissioning disputes. The mechanical boundary is the dielectric isolation flange between facility primary piping (typically carbon steel) and pod secondary piping (stainless 304 or 316); the flange handles thermal expansion, galvanic isolation, and pressure-rating hand-offs at the pod ingress. The electrical boundary is the busway head-end tap-off versus the skid switchboard termination; who owns the connector and its coordination study is a first-day question. The control boundary is the protocol translation between in-pod leak-detection and controls (typically BACnet or Modbus) and the campus EPMS/DCIM; this is where alarm mapping, priority handling, and life-safety integration either work or fail. Each of these is a physical hand-off where vendor scope explicitly ends and operator scope begins.

15Illustrative 2030 procurement mix and what to watch

Rather than pseudo-precise share percentages, the useful framing is which trajectories accelerate or decelerate the value-capture stack in Figure 12.

AUTHOR SCENARIODirectional analysis, not a market forecast. Each row states one plausible trajectory and the specific factors that could bend it.

SegmentDirection of travelWhat could change it
Grey-space integrated incumbents (Eaton, Delta, Rittal power side) Potentially expanding share as acquired manufacturing and integration capabilities scale through reference designs Standards fragmentation (see DC-DC Transition 10/13); hyperscaler internal spec that displaces reference designs; further consolidation via new M&A
White-space integrated incumbents (Schneider EcoStruxure Pod, Vertiv SmartMod, Huawei FusionModule) Growing on AI density transition and cooling-integrated pod adoption Alternate cooling architectures (immersion mainstreaming); operator-side reference designs; hyperscaler direct-buy of components
Specialist modular vendors (regional grey- and white-space specialists) Stable niche in adjacent markets and specific geographies Partnership with an incumbent; regional utility-scale programmes; sovereign AI campus deployments
Operator-integrated platforms (Compass, Vantage, DataBank) Selective expansion tied to hyperscaler volume commits and campus footprint growth Concentration of hyperscaler procurement into fewer operators; disintermediation by direct-buy models
Hyperscaler internal programmes (Microsoft, Meta, Google) Increasing specification power as scale grows and standardisation matures Open reference designs (OCP) becoming the industry default; shift to more commodity procurement
Compute-system pod architectures (Huawei, NVIDIA reference) Potentially expanding in China domestic and constrained-supply markets; secondary in Western hyperscale Geopolitical semiconductor supply changes; NVIDIA reference design uptake at Western hyperscale
Edge / specialty (DataQube, edge-focused OEMs; rack-level thermal products such as DENSO EdgeCool are adjacent) Growing where distributed or constrained-site deployments favour small-footprint modular architectures; product scale varies materially by vendor, and deployment timelines can be substantially shorter than conventional builds Sovereign AI campus programmes; industrial and enterprise on-premise AI adoption

The pattern the trajectories describe: integrated incumbents that own the interface layer can capture more of the content-per-rack expansion across both grey and white space. Operator-integrated platforms hold volume-commit leverage. Hyperscaler internal programmes set specification, which pulls the incumbents toward standardised reference designs. The value capture pattern in Figure 12 is what gives the segmentation its direction.

16The operator model post-modularisation

Modularisation restructures what the data centre operator role covers. The traditional operator model runs across design, procure, build and operate. The modular operator model runs across a different four: specify, assemble, commission, and operate. The shift is from a design-and-build role to a specification-and-integration role.

Figure 13
Operator function migration under modular procurement
TRADITIONAL OPERATOR Design → Procure → Build → Operate MODULAR OPERATOR Specify → Assemble → Commission → Operate Design Architecture, MEP engineering, IT hall layout, cooling and power specifications developed in-house Specify System requirements, hyperscaler SLA envelope, module selection from vendor catalogue Procure Dozens of equipment vendors, standalone quotations, separately negotiated warranties and delivery terms Assemble Integrate skids, pods, shell across several vendors under one operator specification Build General contractor plus subcontractors, sequential trades, on-site fabrication of major electrical and mechanical scope Commission Interface qualification, cooling loop startup, protection coordination testing across vendor products Operate (both models) Facility management plus capacity planning and service delivery. Modular compresses design and build without changing ongoing operate scope. Ongoing thermal-management services take on outsized importance for liquid-cooled halls. Operator functions migrate. Design and procurement compress into specification. Build compresses into assembly. Commissioning grows to cover interface qualification.
The traditional operator model runs design and procurement in-house across dozens of vendors. The modular operator model compresses those functions into specification and assembly, then expands commissioning to cover multi-vendor interface qualification. Whether this shift is margin-accretive depends on whether the operator retains specification power or cedes it to hyperscaler architecture programmes.

Colocation operators. For pure colocation platforms (Compass, Vantage, DataBank, DigitalBridge), the shift makes them skilled interface-buyers; deep design shops stay with other operators. The Compass and Schneider partnership around the EcoStruxure Pod is the clearest shipping example.

Hyperscaler-owned campuses. Microsoft, Meta, and Google run in-house architecture programmes that retain specification power. In the modular operator model, hyperscaler architecture teams can define the reference facility and specify the modular products assembled into it.

Margin implications. The modular operator model can be margin-accretive if the operator retains specification power and captures the interface-qualification value. It can be margin-dilutive if specification power is held by a customer (hyperscaler) and the operator is compressed to a pure assembly role. Operators most exposed to hyperscaler specification power face the strongest margin compression as modular procurement matures.

Skills pipeline. The modular operator model requires different skills than the traditional model. Design and drafting functions shrink. Commissioning and interface qualification grow. Operators that under-invested in commissioning capacity during the pre-AI era typically find themselves rebuilding that capacity now.

17The market-operator layer

The two-category thesis interacts with four operator tiers, each of which uses modular products differently and captures different value from them. The tiers are worth naming because vendor commentary frequently conflates hyperscaler procurement with the broader market.

Figure 16
Operator tiers and how each engages with modular
TIER 1 Hyperscalers MSFT / AWS / Meta / Google / ByteDance / Alibaba TIER 2 Colocation platforms Compass / Vantage / DataBank / Equinix / DR TIER 3 Enterprise + industrial Fortune 500, finance, healthcare, defence TIER 4 Sovereign AI programmes India / GCC / MENA / ASEAN / Nordic HOW EACH ENGAGES WITH MODULAR: Design own reference architecture. Consume incumbent modular product as assembled components against their own spec (Fairwater, OCP, TPU). Buy modular product against vendor reference designs. Some co-engineer (Compass with Schneider). Interface buyers, not deep design shops. Increasingly access hyperscale-grade modular via the same reference designs. Portable specs allow enterprise scale without a bespoke design. Commission at national scale. Prefer modular for speed and repeatability. New growth vector outside the traditional market. SPECIFICATION POWER: Highest. Vendors build to spec. Medium. Spec via co-engineering. Low to medium. Consume references. Rising. Sovereign volume grows. STANDARDS USED: OCP (US), ODCC (China), in-house Vendor reference + operator overlay Vendor reference, occasionally OCP Vendor reference + national overlay Standards fragmentation is now a first-class procurement input. OCP is the North American and Western European reference. ODCC is the Chinese domestic reference, with specifications increasingly divergent from OCP. Nordic bodies (CTS Nordics, Nordic Data Center Association) codify a distinct Nordic hyperscale reference. Vendors that can produce multiple variants at scale can handle this.
The four operator tiers use modular products differently. Hyperscalers set specification and consume modular as components. Colocation platforms buy vendor reference designs with operator overlays. Enterprise and industrial operators increasingly access hyperscale-grade modular through those same reference designs. Sovereign AI programmes are a new growth vector.

Hyperscalers (Microsoft Azure, AWS, Meta, Google, ByteDance, Alibaba) run internal architecture programmes and consume modular product as assembled components against their own reference designs. Their specification power restructures what vendors produce. Microsoft Fairwater architecture, Meta OCP contributions, and Google TPU pod designs each pull incumbent vendors toward hyperscaler-audited configurations; vendor-native reference designs lose share here.

Colocation platforms (Compass, Vantage, DataBank, DigitalBridge, Equinix, Digital Realty) operate between hyperscaler specification and vendor manufacturing. Some, like Compass with Schneider, co-engineer modular products. Others procure through their own construction programmes. The colocation platform tier is the one most structurally affected by the operator-model shift covered.

The colocation multi-tenant paradox. Grey-space skids are universally adopted across operator tiers because power is commoditised in kVA and MW. Colocation platforms serving multiple tenants struggle to deploy rigid white-space pre-fab pods because each hyperscale or enterprise tenant brings distinct rack dimensions (48U versus 52U, standard versus wide), varied cold-plate supply temperatures (ASHRAE W27 to W45), and proprietary cabling architectures. The observable pattern is that grey-space modular is adopted everywhere, while white-space modular is dominated by single-tenant hyperscaler builds and operator partnerships (Schneider with Compass) where the operator can standardise across pods. Multi-tenant colocation operators often deploy grey-space modular fully and stick-build or semi-modular the white space to preserve tenant flexibility.

Mid-tier enterprise and industrial operators (Fortune 500 with on-prem AI, financial services, healthcare, defence contractors) increasingly access hyperscale-grade modular products through the same reference designs that hyperscalers use. The reference-design portability that hyperscalers created makes enterprise-scale modular procurement possible without a bespoke design programme. This is a plausible 2026-2030 growth pattern that hyperscaler-focused commentary tends to miss.

Sovereign AI programmes (India's IndiaAI Mission, UAE's G42, Saudi Arabia's HUMAIN and Alat, Singapore's National AI programme) commission modular data centres at scale to support domestic AI development. Several of these programmes are commissioning or evaluating modular approaches where speed, repeatability, and localised manufacturing are important. The sovereign volume is a growth vector beyond the traditional hyperscaler-plus-colocation market and is one reason the manufacturing footprint evolves toward more localised production over 2027-2030.

Standards fragmentation is now a first-class procurement input. Open Compute Project (OCP) remains the North American and Western European reference. Open Data Center Committee (ODCC) is the Chinese domestic reference, with specifications increasingly divergent from OCP. Nordic bodies (CTS Nordics, Nordic Data Center Association) codify a distinct Nordic hyperscale reference. Vendors that can produce multiple variants at scale handle this fragmentation; it is a real constraint for smaller specialists.

18Commissioning, warranty, and skills

The modular procurement model concentrates specification and factory testing but expands commissioning and interface qualification. Four dimensions of that expansion.

Interface qualification across the composed campus. When Eaton delivers a power skid, Schneider delivers a white-space pod, and Compass delivers the shell, no single vendor has warranted the interface between them. The operator handles interface qualification risk unless it explicitly contracts otherwise. Insurance-stack thinking matters here. What does the equipment warranty cover, what does the general-contractor warranty cover, what does the commissioning-agent liability cover, and what remains uninsured? Most operators encounter this gap on their first fully-modular deployment.

Factory QA and digital twin. Modular's factory-test advantage is a digital-twin story. When the vendor factory tests a unit, the digital twin from that test can travel with the unit and inform on-site commissioning. Schneider, Vertiv, Delta, and Rittal each publish digital-twin capabilities for their factory QA programmes. The operator benefit is that commissioning validates against a digital baseline; design intent alone stays weaker as a validation reference. Adoption is uneven across operators, and the operators that build this into procurement contracts run cleaner commissioning cycles.

OT/SCADA cybersecurity. Modular products ship with vendor-managed controls, firmware, and remote-diagnostics capabilities. This creates OT/SCADA cybersecurity exposure that stick-built facilities may not. IEC 62443 compliance, factory-managed patch delivery, and secure-boot on skid controllers are becoming procurement requirements at the hyperscaler tier and are propagating downward. This remains a real gap in most enterprise-tier procurement specifications.

Skills pipeline. The modular operator model needs different skills. Interface qualification, cooling-loop commissioning, DC protection coordination testing, factory-to-site digital-twin reconciliation. These skills differ from traditional facility engineering. Operators that under-invested in commissioning capacity through the 2010s are rebuilding it now. The commissioning skills bottleneck is a genuine 2027-2030 constraint. Industry associations (Uptime Institute, DCPro, AFCOM, BICSI) have been slow to update apprenticeship and certification frameworks. Some operators run in-house academies to close the gap; the ones that do treat it as a capex line; a training-expense treatment stays undercapitalised.

Hydro-commissioning and water quality. The commissioning boundary between grey-space chilled-water loops (raw CHW or condenser water) and white-space technology cooling systems (TCS, typically a 25% propylene glycol solution) is where liquid-cooling deployments most commonly stall. Chemical passivation of the secondary loop, particulate filtration (50-micron and tighter), and helium leak testing before pod energisation are procurement requirements; commissioning nice-to-have treatment stays under-specified. ASHRAE TC 9.9 sets the reference framework; specialist fluid-management services (which is what Vertiv acquired in PurgeRite) handle the flushing, chemistry, and testing scope that operators would otherwise have to build in-house.

The 800 VDC transition compounds the commissioning problem. The DC-DC Transition series essay 12/13 covers the retraining requirement for 800 VDC work in detail. In the modular context, the practical consequence is that a factory-tested 800 VDC skid still needs commissioning personnel who can validate DC protection coordination, arc-fault detection, and battery integration at the site. This is a specific hiring problem for operators moving to 800 VDC native architectures over 2027-2030.

19The consolidation frontier

The 2024-2026 incumbent transactions concentrated on grey-space power skids, prefabricated white-space pods, and (with Ecolab/CoolIT) the white-space thermal interface. Several specialist categories occupy adjacent positions to those layers and could plausibly attract the next round of integration-oriented transactions.

Figure 14
Specialist categories at the consolidation frontier
CATEGORY EXEMPLAR VENDORS STRUCTURAL POSITION CDU manufacturers Pod-to-facility water interface CoolIT, Motivair, USystems, Boyd Specialist CDU market, DTC-native at pod scale Directly on cooling interface Attractive for pod-owning vendors seeking interface control Fluid-management + leak detection Liquid-cooling lifecycle services Leak-detection cable makers, cold-plate specialists Adjacent to PurgeRite (Vertiv acquisition 2025) Recurring-service value layer First-mover advantage for services-native buyers High-power busway + DC protection 800 VDC native infrastructure SSCB manufacturers, DC arc-flash sensors Growing with DC-DC Transition adoption DC-native interfaces at pod and skid Attractive as reference designs move to procurement Prefab shell + campus specialists Campus-scale factory-built shell Compass, Vantage, DataBank programmes Operator-integrated shell manufacturing Partnership or acquisition path both viable Schneider-Compass demonstrates the partnership model Immersion + dielectric fluid Different form-factor product class Submer, Green Revolution Cooling Outside pod-plus-hall composition architecture Arm's-length model persists unless immersion mainstreams Contingent on AI workload standardisation trajectory
Categories highlighted in vermillion occupy positions closest to the interface layers the current incumbents already own. The consolidation frontier depends on how quickly the DC-DC transition, liquid-cooling standardisation, and AI workload architecture converge across the industry.

Coolant distribution unit (CDU) manufacturers (white-space adjacency). Beyond CoolIT ( ), Motivair, USystems, and Boyd Corporation are among the specialist CDU vendors operating at this interface. As DTC becomes native to prefabricated pods, the CDU occupies the pod-to-facility water interface directly.

Fluid-management and leak-detection specialists (white-space adjacency). The 2025 Vertiv PurgeRite acquisition was a substantial move into the liquid-cooling services layer. Adjacent categories, such as leak-detection cable manufacturers, dielectric-coolant chemistry providers, and cold-plate specialist fabricators, occupy similar structural positions.

High-power busway and DC protection (grey-space adjacency). As 800 VDC native architectures move from reference designs to procurement (see the DC-DC Transition series), the busway and DC protection layers become more valuable. Specialist SSCB manufacturers, DC arc-flash sensor vendors, and high-power busway fabricators could attract acquisition interest from the modular incumbents.

Prefabricated shell and campus specialists. Compass Datacenters, Vantage Data Centers, and DataBank each hold significant portfolios of campus-scale factory-built shell capability. The Schneider partnership with Compass demonstrates one model for how an infrastructure incumbent can access shell scale without owning the operator.

Immersion cooling and dielectric fluid vendors. Submer, Green Revolution Cooling, and adjacent immersion specialists operate outside the pod-plus-hall composition architecture, which limits their attractiveness to the current incumbent set. If a subset of AI workloads standardises on immersion, this changes.

20What this means for operator procurement

Two practical implications hold the two-category thesis into procurement:

Read the category correctly, underwrite interface ownership. Grey-space power skids and white-space IT pods are structurally different products. Product-level vendor comparison loses analytical purchase when the campus is composed across both categories. The vendors capturing the standardisation returns are the ones owning interface qualification; ask which vendor owns which interface, which interfaces the pod or skid spec locks in, and where replacement-path risk concentrates.

Sequence the workstreams in parallel with the hardware. Utility interconnection application starts before the modular hardware order. Site preparation runs in parallel with factory assembly. Commissioning skills pipeline belongs at Stage-1 hiring. The modular template compresses the build but does not compress the sequencing around it.

21How modular evolves 2027-2030

AUTHOR SCENARIOThe 2024-2026 incumbent moves establish the grey-space and white-space split. The next three-year window looks likely to compound the same pattern along axes.

Figure 15
Directional evolution of modular data centre categories, 2024-2030
2024 2026 2028 2030 Grey-space standards Vendor reference designs Eaton, Delta, Schneider, Vertiv OCP / ORV3 uptake at hyperscale 800 VDC native power skids move from reference to procurement White-space cooling RDHx + early DTC Air-hybrid dominant DTC native in white-space pods; CDU-per-pod standard Immersion mainstreams in specific workloads; lifecycle services scale Consolidation frontier Fibrebond, NordicEPOD, EcoStruxure Pod, PurgeRite CoolIT / Ecolab pattern repeats. CDU makers, leak-detection specialists, SSCB manufacturers, and shell operators attract incumbent capital. Regional buildout NA hyperscale + EMEA Nordic + Ireland India + GCC + APAC hyperscale volume; sovereign AI programmes drive modular procurement in emerging markets; CBAM restructures EMEA sourcing Operator model Design + procure + build operate (traditional) Specify + assemble + commission + operate becomes the default. Hyperscaler specification power grows; colocation operators become interface buyers. Reading the timeline: Vermillion bands mark the direction of travel that the 2024-2026 window has set up. The axes are independent but reinforce each other. Directional scenario. Timing, magnitude, and interaction effects depend on hyperscaler capex allocation, standards convergence, and cross-border trade dynamics.
Evolution axes to 2030: standards convergence in grey-space; DTC-native in white-space; further consolidation in cooling and DC-protection adjacencies; regional buildout shift to APAC and sovereign programmes; and operator-model migration completing its transition to specification-and-integration. None of these are point predictions.

Standards convergence in grey space. Open Compute Project reference designs (ORV3, MHPS) and their equivalents at ODCC (China) and Nordic standardisation bodies have been mostly reference-only through 2026. Hyperscaler procurement volume is starting to pull incumbent products toward those reference specs. The likely destination is fewer vendor-proprietary interfaces and more standardised, hyperscaler-audited configurations. This concentrates procurement toward vendors that can meet the reference at scale. The 800 VDC transition (see the DC-DC Transition series) is the deeper shift under this dynamic.

DTC native in white space. Direct-to-chip liquid cooling has been optional through 2024-2026; the DTC-native white-space pod becomes the default configuration for AI training campuses over 2027-2030. Immersion mainstreams in specific workloads (some inference clusters, some HPC/scientific compute); DTC stays dominant across the board. Lifecycle services (PurgeRite-type fluid management) scale with the installed base of liquid-cooled halls.

Consolidation frontier moves to adjacent categories. The 2024-2026 incumbent transactions run from the pre-integrated skid and prefabricated pod (Eaton, Schneider, Vertiv) through into the thermal-interface layer with CoolIT/Ecolab in July 2026. Leak-detection specialists, dielectric-coolant chemistry providers, cold-plate specialist fabricators, SSCB manufacturers, and campus-shell operators are structurally similar targets. The pattern of 2024-2026 repeats along adjacent categories.

Regional buildout shifts. North American hyperscale plus European (Nordic + Ireland) programmes dominated 2024-2026 modular procurement. Over 2027-2030 the volume weight moves. India and Gulf Cooperation Council sovereign AI programmes commission at scale; APAC hyperscaler volume expands; CBAM starts to drive the delivered economics of imported prefab into EMEA. The manufacturing footprint evolves accordingly, with more localised production in India and MENA joining the existing US, Nordic, and Chinese anchors.

Operator model completes its transition. The specification-and-integration model becomes the default; the emerging-alternative framing fades. Colocation operators complete the transition to skilled interface buyers; hyperscalers extend specification power across more of the stack; mid-tier enterprise operators access hyperscale-grade modular products through the same reference designs that hyperscalers use. The skills pipeline for interface qualification and commissioning becomes a first-class capex line for operators that lag on it.

What could bend these trajectories. A sharp hyperscaler capex pause (not the base case) delays every axis by 12-24 months. A geopolitical constraint on cross-border modular movement (India-China, US-China) fragments the vendor field along regional lines. An unexpected cooling breakthrough (single-phase immersion at hyperscale, cost-parity two-phase) restructures the DTC-vs-alternatives dynamic. A materials cost shock (transformer steel, lithium battery pricing) reprices grey-space skids. Each of these is a real risk; none is the base case as of 2026.

Frequently asked

What are the categories of modular data centre?

Grey-space modular is the power skid: MV/LV transformer, LV switchgear, UPS, batteries, controls, factory-assembled into one tested unit that delivers reliable predictable power to racks elsewhere on the campus. White-space modular is the IT-hall pod: rack rows, hot-aisle containment, in-pod cooling (CDU + secondary loop), busway, cabling, and integrated leak detection. Cooling appears in white-space pods because the pod houses the racks. DD OBSERVATIONIn the vendor field examined here, grey-space power skids appear to account for most merchant modular volume.

What is inside a grey-space modular power skid?

A typical Eaton Fibrebond or NordicEPOD power skid contains an MV/LV transformer, LV switchgear and panel boards, a UPS module with an integrated battery cabinet, controls and monitoring, skid HVAC for the electrical room only, and fire suppression. It exposes an MV feed on the utility side and an LV busway on the facility side. The skid delivers reliable predictable power to racks housed elsewhere on the campus.

What is inside a white-space modular pod?

A Schneider EcoStruxure Pod or Vertiv SmartMod Max opens to two rows of IT racks in a hot-aisle containment configuration, an in-pod CDU sized to the pod's IT load with a secondary water loop pre-plumbed and quick-disconnect connectors on the cold-plate side, an overhead busway with per-rack drop-outs, structured cabling, and integrated leak-detection. Cooling appears in this product class because the pod contains the racks.

What were the major modular data centre M&A moves in 2024-2026?

Eaton took a 49% strategic minority stake in NordicEPOD (May 2024, grey-space) and acquired Fibrebond for $1.4 billion (closed April 2025, grey-space). Schneider Electric and Compass Datacenters jointly launched a prefabricated EcoStruxure Pod (September 2025, white-space). Vertiv expanded its SmartMod family and separately acquired PurgeRite for approximately $1 billion cash plus up to $250 million in additional consideration (announced November 4, 2025; completed December 4, 2025). Ecolab closed its acquisition of CoolIT Systems on July 2, 2026 for approximately $4.75 billion, capturing the white-space thermal interface.

Does modular procurement reduce data centre time to revenue?

Modular procurement compresses construction time from serial site work into parallel factory work. Energisation, commissioning, and utility interconnection follow their own timelines and remain independent of factory fabrication cadence. In constrained markets, ground-break to revenue-ready can still run 24-48 months or longer even when modular hardware is fabricated in months. Utility interconnection is frequently the critical path; module fabrication finishes earlier.

Why does cooling appear in white-space pods but not in grey-space skids?

Grey-space power skids contain electrical infrastructure only. The only cooling inside a power skid is HVAC for the electrical room to keep transformers, UPS, and switchgear at operating temperature; the racks themselves are housed in a separate white-space unit. White-space pods contain the racks, so the pod needs an in-pod CDU, secondary water loop, and cold-plate quick-disconnects to serve the rack-level heat load. At 100+ kW per rack, direct-to-chip liquid cooling becomes practical and eventually necessary, which is why the AI density transition drove the growth of the white-space pod category.

Method and sources. This essay combines publicly disclosed corporate transactions and product specifications with anonymised author DD observations from 2024-2026 engagements. Evidence classes are marked in the text with the badges introduced at the top: PUBLIC FACT for corporate disclosures, PUBLISHED ESTIMATE for third-party research, AUTHOR SCENARIO for author-synthesised ranges, DD OBSERVATION for anonymised private observations.

Primary corporate sources. The principal corporate transaction and product claims in this essay are traceable to first-party disclosures:

Third-party market-size estimates: MarketsandMarkets, Fortune Business Insights, Straits Research, Mordor Intelligence, Technavio 2024-2026 reports. Category definitions and geographic scopes vary across sources, so direct comparison requires caution.

Timeline ranges: Stick-built vs modular timelines synthesised from vendor product material, operator commentary, and author DD engagements 2024-2026; specific project timelines are site-specific and depend on jurisdiction, cooling architecture, and interconnection queue position.

Companion reading. The DC-DC Transition series covers the 800 VDC transition that interacts with the modular hall spec. The essay on cooling co-emergence covers the direct-to-chip liquid cooling requirement that modular AI pods integrate. The retrofit-vs-greenfield decision framework connects here because the modularisation advantage is strongest when interfaces can be standardised before construction; reconstruction inside an operating facility stays slower.

Disclosures. No advisory relationship with any named party. Nothing here is investment advice.