How the AI buildout is financed
Six pools of capital finance the AI infrastructure buildout: hyperscaler cash flow, REITs, OEM balance sheets, structured debt, sovereign, and PE. Part I of The Investment Layer.
The AI Power Chain
Complete · 6 essays + 6 companionsThe Wide-Bandgap Stack: Boom, Bust, and the Rebuild of AI's Power Semiconductor Chain
The Thermal Stack: How Heat Became the Binding Constraint on AI Compute
The Interconnect Stack: Transformers, Switchgear and the Grid Equipment That Gates the AI Buildout
The On-Package Delivery Stack: How 48V Becomes 0.8V at 2,250 Amperes
The Modular Datacenter Stack: How the Building Gets Built (When There Aren't Enough Electricians)
The AI Power Chain: Vendor Screen
Pricing Under Scarcity
The Services Inversion
The Wide-Bandgap Stack: Technical Companion
The Thermal Stack: Technical Companion
The Capacitor Stack: Technical Companion
The Interconnect Stack: Technical Companion
The On-Package Delivery Stack — Technical Companion
The Modular Datacenter Stack Technical Companion
The AI Power Chain is a six-part series on the physical infrastructure of AI compute, walking from the medium-voltage utility bus down to the 0.8V transistor gate. Each part has an optional technical companion that walks through the underlying physics and process flows.
The Investment Layer
Publishing daily · 2 of 8 liveEight essays for capital allocators: how the AI infrastructure buildout is financed, where the M&A moves next, and where the mispricing sits. Publishing daily through 17 August 2026.
The DC-DC Transition
OccasionalThe real reason data centres are going DC (and it's not capacity alone) (1/13)
Two architectures wearing the same name (and why hyperscalers built their own) (2/13)
The architecture map (where every stage lives, who builds it, what's standardized) (3/13)
The DC-DC Transition is a 13-part series on AI data centre power architecture. New essays publish monthly.