Grid-to-Chip P3 · Campus Power: MV distribution, SSTs and the power-transformer bottleneck
·43 min read·Updated
The P3 stack: P3.1 site substation (HV to MV), P3.2 MV distribution, P3.3 hall conversion (MV to LV or MV to 800V DC via SST), P3.4 hall interface. The power-transformer bottleneck sits at P3.1.