Skip to content
adikumar.co
Research Frameworks Tools Advisory About
ESSAY ·The DC-DC Transition

Power quality, harmonics, and grid interaction at 800 VDC (9/13)

Harmonics, IEEE 519, IEEE 1547 IBR framing, filter topology, and the Talen-Amazon Susquehanna ruling. Why interconnection studies now include power quality.

20 August 2026 · 20 min read
ESSAY ·The DC-DC Transition

800 VDC and liquid cooling are becoming one architecture (8/13)

Rack density is the common boundary condition for both power and thermal architecture. Three couplings — density, interface, failure/control — with GB300 NVL72 as the case study.

20 August 2026 · 25 min read
ESSAY ·The DC-DC Transition

Retrofit versus greenfield: the DC-DC decision framework (7/13)

Retrofitting an AC facility to 800 VDC is technically possible but rarely economic. Greenfield beats retrofit on 10-year TCO by 30-50 percent under typical assumptions. Retrofit only makes sense in three narrow cases; most operators should scope a satellite greenfield instead.

20 August 2026 · 20 min read
ESSAY ·The DC-DC Transition

Battery integration at 800 VDC: how the UPS architecture rebuilds (6/13)

Native 800 VDC UPS collapses 4 conversion stages to 2 and connects the battery directly to the DC bus. End-to-end efficiency climbs 4-6 points. BMS complexity increases sharply. LFP is displacing NMC in data centre UPS applications faster than in the EV market.

20 August 2026 · 27 min read
ESSAY ·The DC-DC Transition

Grounding, bonding, and DC ground-fault protection at 800 VDC (5/13)

Grounding topology at 800 VDC is a Stage-1 architecture decision that interacts with arc-fault protection and insurance. TN-S vs IT-System has different scaling properties at hyperscale. Insulation-resistance monitoring runs into engineering limits above 100 MW connected load.

20 August 2026 · 18 min read
ESSAY ·The DC-DC Transition

Arc behaviour, protection, and how insurance is catching up (4/13)

DC arcs sustain because DC current never crosses zero. Schneider Electric's August 2026 study found 800 VDC arc-flash risk comparable to AC when architecture, capacitor placement and clearing are specified correctly. Protection topology drives insurance tiering.

20 August 2026 · 23 min read
RECAP ·what-changed

July 2026: the month the grid became the ceiling: What Changed Issue 01

What Changed Issue 01. A one-page monthly recap on AI infrastructure power. What NVIDIA, OCP, hyperscalers, and power equipment vendors did in July 2026, what the market is getting wrong, and what to watch over the next six months.

20 August 2026 · 6 min read
ESSAY ·Due Diligence for the AI Buildout

Team, timeline, and the anatomy of a data room

Scoping decides what to test. Execution decides whether the tests get run with signal or noise. Team composition, workstream sequencing, and data room engagement.

20 August 2026 · 39 min read
ESSAY ·Deal Watch

NVIDIA / OpenAI PORTS-Pike: what DD would flag on a $105B guarantee for a phased 4.25 GW Ohio campus

A chip vendor guaranteeing $105B of a customer's lease and power obligations, taking a $1.5B direct equity investment in the project SPV, and standing behind a $4.2B utility grid partnership. Operational DD lens on the NVIDIA-OpenAI PORTS-Pike deal.

19 August 2026 · 19 min read
ESSAY ·Deal Tear-Down

Equinix + CPP / atNorth $4B: what DD would flag on a Nordic data centre take-out

Partners Group exits atNorth. CPP takes 60 percent, Equinix takes 40 percent as strategic operator. Commercial DD scoping applied to a joint sponsor-plus-strategic acquisition of Nordic data centre capacity.

19 August 2026 · 18 min read
ESSAY ·Due Diligence for the AI Buildout

The scoping decision

Most of what determines whether DD creates or destroys value happens before the data room opens. What to examine, at what depth, against what walk-away criteria, with what pre-committed authority.

18 August 2026 · 40 min read
ESSAY ·The Investment Layer

Sovereign capital and industrial policy

Eight sovereign capital pools, twelve national industrial policy programmes, and how the landscape reshapes over the next 24 months. Part VIII of The Investment Layer.

17 August 2026 · 24 min read
← Newer Page 6 of 9 Older →
Frameworks
  • The AI Power Chain
  • The Investment Layer
  • Due Diligence Framework
  • Grid-to-Chip
Series
  • The DC-DC Transition
  • The Regulatory Layer
  • Financing the AI Buildout
  • Tech Spotlights
  • Case Studies
  • Deal Tear-Down + Watch
  • What Changed (monthly recap)
Reference & Tools
  • Knowledge Base
  • Adi's Theses
  • Glossary
  • Vendor Screen
  • Question Banks
  • DD Evidence Matrix
  • Investment Scorecard
  • Investment Workbench
Engage
  • Advisory
  • About
  • adi@adikumar.co
  • LinkedIn
  • X (@NormalisedAlpha)
© 2026 Adi Kumar. All rights reserved. All content on this site — including essays, analysis, frameworks, charts, models, code, visualisations, and interactive tools — is the copyrighted work of Adi Kumar. No part may be reproduced, distributed, transmitted, republished, syndicated, adapted, translated, stored in a retrieval system, quoted at length, incorporated into commercial products or reports, or used to train machine-learning or artificial-intelligence models — in whole or in part, in any form or by any means — without the prior express written permission of the author. Brief quotations of up to 100 words with clear attribution and a direct link to the source page are permitted under fair use. All other uses require written consent: adi@adikumar.co.
Written by Adi Kumar · Privacy